BLD-Final | 12/3/2002 | 12/4/2002 | 12/4/2002 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/03/2002 at 20:05:21. Contact: ###-####.
|
BLD-Energy code compliance | 8/5/2002 | 8/5/2002 | 8/5/2002 | P | PASS |
Steven Webb
|
|
|
###-#### neil
|
BLD-Framing/Rough-in | 7/29/2002 | 7/30/2002 | 7/30/2002 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 07/29/2002 at 13:01:15. Contact: ###-####. Ok to insulate. 7/30/2002 12:00:50 PM
|
BLD-Conference | 7/15/2002 | 7/16/2002 | 7/16/2002 | A | DONE |
Steven Webb
|
|
|
NEAL ###-####
|
BLD-Conference | 4/3/2002 | 4/3/2002 | 4/3/2002 | A | PART |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 4/3/2002 11:14:25 AM . 4/3/2002 11:17:30 AM zoning called and said the set backs on garage would be ok as is. 4/3/2002 11:18:58 AM
|
BLD-Final | 4/3/2002 | 4/3/2002 | 4/3/2002 | A | CANC |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 4/3/2002 11:05:32 AM
|
BLD-Foundation | 3/31/2002 | 4/1/2002 | 4/1/2002 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/31/2002 at 22:05:37. Contact: ###-####.rear addition ok front garage appears to be out of compliance for a minimum of 20 foot set back required, talked with home oner who is doing work, told him to have pins located or check with p/z for esser setbacks based on no door to park cars . 4/1/2002 12:04:49 PM
|
BLD-Foundation | 3/29/2002 | 3/29/2002 | 3/29/2002 | P | CANC |
Steven Webb
|
|
|
###-#### NEIL Will re-schedule for monday. 4/1/2002 7:56:12 AM
|
BLD-Footing | 3/19/2002 | 3/19/2002 | 3/19/2002 | P | PART |
Steven Webb
|
|
|
###-#### NEIL wip--appears ok 3/19/2002 1:24:55 PM
|