BLD-Final | 7/1/2002 | 7/2/2002 | 7/2/2002 | A | PASS |
Dave Hannah
|
|
|
RON ###-#### c.c # 7/2/2002 9:08:12 AM 16487 issued 7/2/2002 9:08:23 AM
|
BLD-Final | 7/1/2002 | 7/2/2002 | 7/2/2002 | A | CANC |
Steven Webb
|
|
|
RON ###-####
|
BLD-Energy code compliance | 4/16/2002 | 4/17/2002 | 4/17/2002 | A | PASS |
Steven Webb
|
|
|
ron- ###-####
|
BLD-Framing/Rough-in | 4/16/2002 | 4/17/2002 | 4/17/2002 | A | PASS |
Steven Webb
|
|
|
shear ron-###-####
|
BLD-Framing/Rough-in | 4/15/2002 | 4/16/2002 | 4/16/2002 | A | FAIL |
Steven Webb
|
|
|
###-#### RON SHEAR--All shear panels have not had covering removal at time of inspection. Remove per prior c/notice, nail per approved plans & block seams and call for re-inspection. 4/16/2002 10:30:44 AM
|
BLD-Framing/Rough-in | 4/12/2002 | 4/15/2002 | 4/15/2002 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 04/12/2002 at 12:07:01. Contact: ###-####. c/n ok to insulate but exterior not ready to cover. 4/15/2002 3:04:03 PM
|
BLD-Framing/Rough-in | 4/11/2002 | 4/12/2002 | 4/12/2002 | A | FAIL |
Steven Webb
|
|
|
###-#### RON Shear and framing--Ext. already covered, contractor to remove material above shear panels and holdown straps.. No seal package or electrial r.in done at time of inspection. C/n with several other items--Do not insulate or side . 4/12/2002 11:26:12 AM
|
BLD-Foundation | 2/22/2002 | 2/25/2002 | 2/25/2002 | A | PART |
Steven Webb
|
|
|
found wall jerry -###-#### appears ok-no approved plans on site-pour at own risk 2/25/2002 9:53:48 AM
|
BLD-Footing | 2/22/2002 | 2/22/2002 | 2/22/2002 | P | PART |
Jim Sly
|
|
|
###-####
|