BLD-Final | 12/12/2002 | 12/13/2002 | 12/13/2002 | A | PASS |
Russ Owen
|
|
|
left over from yesterday. 12/12/2002 5:31:08 PM
|
BLD-Final | 12/12/2002 | 12/12/2002 | 12/12/2002 | P | CANC |
Russ Owen
|
|
|
###-#### BRUCE to many others. 12/12/2002 5:31:24 PM
|
BLD-Final | 11/21/2002 | 11/21/2002 | 11/21/2002 | P | FAIL |
Jim Storey
|
|
|
###-#### need hvac and handrail/ ladders out of egress windows or rase elavition. 11/21/2002 4:43:39 PM
|
BLD-Final | 11/14/2002 | 11/15/2002 | 11/15/2002 | A | CANC |
Steven Webb
|
|
|
###-#### Cancelled by owner-will re-schedule. 11/15/2002 10:27:09 AM
|
BLD-Framing/Rough-in | 7/19/2002 | 7/19/2002 | 7/19/2002 | P | PASS |
Russ Owen
|
|
|
ok except bathroom still needs plumbing ran and inspected. Also note the drywall has been installed in the lid with out approval.as home owner was not aware of inspection requirements. 7/19/2002 3:29:58 PM
|
BLD-Framing/Rough-in | 7/17/2002 | 7/17/2002 | 7/17/2002 | A | PART |
Russ Owen
|
|
|
still need the steel beam calcs as they have removed 2nd beam as shown to be on plans. also need to complete fire place framing, left a c/n on fire place ,also talked with Tony Young,and framer on site Brian,and home owner. Also note do not cover plumbing wall.7/17/2002 1:11:04 PM 7/17/2002 1:11:27 PM
|
BLD-Energy code compliance | 7/16/2002 | 7/16/2002 | 7/16/2002 | P | PASS |
Russ Owen
|
|
|
bruce -###-####
|
BLD-Framing/Rough-in | 7/16/2002 | 7/16/2002 | 7/16/2002 | P | PART |
Russ Owen
|
|
|
bruce -###-####. ok pending beam ok for deletion. 7/16/2002 5:26:56 PM
|
BLD-Framing/Rough-in | 7/15/2002 | 7/15/2002 | 7/15/2002 | A | CANC |
Russ Owen
|
|
|
i called this number to tell them that they need to call for inspection as they left a message as such on my recorder. 7/15/2002 3:07:15 PM
|
BLD-Final | 4/1/2002 | 4/2/2002 | 4/2/2002 | A | NR |
Dave Hannah
|
|
|
###-#### tony fn
|
BLD-Other | 4/2/2002 | 4/2/2002 | 4/2/2002 | A | PASS |
Dave Hannah
|
|
|
Added by Inspector: 425 On 4/2/2002 10:26:32 AM concrete work is finished home owner taking over has contractor coming in to start framing stairs and walls
|
BLD-Framing/Rough-in | 3/18/2002 | 3/18/2002 | 3/18/2002 | P | PART |
Russ Owen
|
|
|
###-#### tony . east and north walls complete. 3/18/2002 5:17:41 PM
|
BLD-Foundation | 3/13/2002 | 3/14/2002 | 3/14/2002 | P | PART |
Russ Owen
|
|
|
basement wall ###-####-tony . south portion ready. 3/14/2002 4:48:57 PM
|