BLD-Final | 5/30/2002 | 5/30/2002 | 5/30/2002 | A | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 05/30/2002 at 06:58:03. Contact: ###-####.
|
BLD-Final | 5/30/2002 | 5/30/2002 | 5/30/2002 | P | PASS |
Jim Sly
|
|
|
C/C issued. 5/30/2002 4:04:36 PM
|
BLD-Energy code compliance | 4/16/2002 | 4/16/2002 | 4/16/2002 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 04/16/2002 at 07:21:22. Contact: ###-####.
|
BLD-Framing/Rough-in | 4/15/2002 | 4/15/2002 | 4/15/2002 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 04/15/2002 at 10:32:56. Contact: ###-####. C/N posted. 4/15/2002 12:51:21 PM
|
BLD-Wall cover | 4/5/2002 | 4/5/2002 | 4/5/2002 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 04/05/2002 at 07:25:42. Contact: ###-####. Shear OK. 4/5/2002 12:09:20 PM
|
BLD-Foundation | 3/12/2002 | 3/12/2002 | 3/12/2002 | P | PART |
Tom Arcoraci
|
|
|
Added by Inspector: 408 On 3/12/2002 2:08:26 PM hds not in place
|
BLD-Framing/Rough-in | 3/12/2002 | 3/12/2002 | 3/12/2002 | P | NR |
Tom Arcoraci
|
|
|
###-#### PAT
|
BLD-Footing | 3/8/2002 | 3/8/2002 | 3/8/2002 | P | PASS |
Jim Sly
|
|
|
steve-- ###-####
|
BLD-Footing | 3/6/2002 | 3/7/2002 | 3/7/2002 | P | CANC |
Jim Sly
|
|
|
###-#### LOGAN
|