Permit Information
Permit NumberBLD02-00358
StatusFinaled
Name BRIGHTON CORPORATION
Site Address 3148 S WHITE FIR PL
Project Name 
Customer Number 
ePlanReviewNo
Description
To build a new 2501s.f.; 2-story; 3-bedroom single family dwelling with 2216s.f. on the main level and a 285s.f. bonus room over the 775s.f. 3-car garage using attic type trusses. R-1C/DA setbacks ok per rhj. All per the approved plans as marked and the attached. PC# 084 pep----- 5/8/02 MODIFICATION TO APPROVED PLANS. Bonus room over garage will be classified as un-finished, future bonus room. Stair opening will be framed and sheet rocked. Adequate attic access will be provided from within garage. This space will require seperate permits to convert into habital area. Natural light and ventilation requirements will be met at this time. DJO
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/26/20026/27/20026/27/2002APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 06/26/2002 at 15:33:48. Contact: .c.c # 16484 issued 6/27/2002 9:46:28 AM
BLD-Wall cover5/16/20025/16/20025/16/2002APASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 05/16/2002 at 07:25:02. Contact: .
BLD-Wall cover5/15/20025/15/20025/15/2002PFAIL
DetailsSteven Webb
Scheduled by a contractor via Hello! on 05/15/2002 at 07:45:51. Contact: . C/N posted--Completed bracing of gables per engineering. Re-inspection fee of $42.00. 5/15/2002 1:39:18 PM
BLD-Wall cover5/14/20025/14/20025/14/2002PFAIL
DetailsSteven Webb
Scheduled by a contractor via Hello! on 05/14/2002 at 07:19:44. Contact: . Items on prior c/n not completed-do not cover 5/14/2002 4:16:30 PM
BLD-Framing/Rough-in5/9/20025/9/20025/9/2002PPART
DetailsSteven Webb
Scheduled by a contractor via Hello! on 05/09/2002 at 07:47:48. Contact: . C/N ok to insulate 5/9/2002 1:53:04 PM
BLD-Framing/Rough-in5/1/20025/2/20025/2/2002PNR
DetailsSteven Webb
Scheduled by a contractor via Hello! on 05/01/2002 at 15:06:53. Contact: . Permit not attached to permit, c/n posted, if card conditions does not include a unfinished bonus room re-submittal to plan review is required. Do not insulate 5/2/2002 1:51:08 PM
BLD-Framing/Rough-in4/11/20024/11/20024/11/2002PPART
DetailsSteven Webb
sheer inspect ###-#### terry Ok to side 4/11/2002 1:16:00 PM
BLD-Foundation3/13/20023/14/20023/14/2002PCANC
DetailsSteven Webb
###-#### CHRIS
BLD-Foundation3/13/20023/13/20023/13/2002PPART
DetailsSteven Webb
Scheduled by Inspector: 420 On 3/13/2002 1:57:27 PM wip--95% ready at time of inspection 3/13/2002 2:01:22 PM
BLD-Footing3/11/20023/12/20023/12/2002APART
DetailsSteven Webb
###-#### 30% ready at time of inspection 3/12/2002 10:04:11 AM
BLD-Footing3/12/20023/12/20023/12/2002PCANC
DetailsSteven Webb
chris ###-#### ft
BLD-Footing3/8/20023/8/20023/8/2002PCANC
DetailsSteven Webb
###-#### MIKE Cancelled by contractor 3/8/2002 2:28:26 PM