BLD-Final | 7/26/2002 | 7/26/2002 | 7/26/2002 | P | PASS |
Dave Hannah
|
|
|
###-#### chris c.c # 17 7/26/2002 2:36:33 PM614 issued 7/26/2002 2:36:42 PM
|
BLD-Energy code compliance | 5/15/2002 | 5/16/2002 | 5/16/2002 | A | PASS |
Steven Webb
|
|
|
###-####
|
BLD-Framing/Rough-in | 5/15/2002 | 5/16/2002 | 5/16/2002 | A | DONE |
Steven Webb
|
|
|
|
BLD-Energy code compliance | 5/15/2002 | 5/15/2002 | 5/15/2002 | P | FAIL |
Steven Webb
|
|
|
chris- ###-#### energy C/N posted--Completed insulation and call for re-inspection. 5/15/2002 2:25:59 PM
|
BLD-Framing/Rough-in | 5/15/2002 | 5/15/2002 | 5/15/2002 | P | DONE |
Steven Webb
|
|
|
fr insp chris- ###-####
|
BLD-Framing/Rough-in | 5/13/2002 | 5/14/2002 | 5/14/2002 | A | DONE |
Dave Hannah
|
|
|
###-#### CHRIS
|
BLD-Framing/Rough-in | 5/14/2002 | 5/14/2002 | 5/14/2002 | P | CANC |
Dave Hannah
|
|
|
###-####
|
BLD-Framing/Rough-in | 5/10/2002 | 5/13/2002 | 5/13/2002 | P | FAIL |
Dave Hannah
|
|
|
fr & foam & caulk- ###-####-chris c/n on site ok to insulate 5/13/2002 3:59:23 PM
|
BLD-Framing/Rough-in | 5/2/2002 | 5/2/2002 | 5/2/2002 | P | PART |
Dave Hannah
|
|
|
sheer panel ###-#### chris ok to cover ext 5/2/2002 3:45:44 PM
|
BLD-Foundation | 4/1/2002 | 4/2/2002 | 4/2/2002 | A | CANC |
Steven Webb
|
|
|
found wall mana- ###-#### Cancelled by contractor. 4/2/2002 10:47:11 AM
|
BLD-Foundation | 4/1/2002 | 4/2/2002 | 4/2/2002 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 04/01/2002 at 16:32:20. Contact: ###-####. wip 4/2/2002 2:01:55 PM
|
BLD-Footing | 4/1/2002 | 4/1/2002 | 4/1/2002 | P | PASS |
Steven Webb
|
|
|
ft insp mana- ###-####
|