BLD-Final | 6/25/2002 | 6/26/2002 | 6/26/2002 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 06/25/2002 at 15:50:28. Contact: . C. of C. #22479 6/26/2002 7:50:44 AM
|
BLD-Final | 6/25/2002 | 6/25/2002 | 6/25/2002 | P | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 06/25/2002 at 09:51:25. Contact: . C/N posted--Tempered glass required in east upstairs bath within 5' of standing surface of tub. 6/25/2002 1:47:27 PM
|
BLD-Energy code compliance | 5/2/2002 | 5/2/2002 | 5/2/2002 | A | PASS |
Dave Hannah
|
|
|
Added by Inspector: 425 On 5/2/2002 10:38:05 AM
|
BLD-Framing/Rough-in | 5/2/2002 | 5/2/2002 | 5/2/2002 | A | PASS |
Dave Hannah
|
|
|
Added by Inspector: 425 On 5/2/2002 10:37:49 AM
|
BLD-Wall cover | 5/1/2002 | 5/2/2002 | 5/2/2002 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 05/01/2002 at 15:05:18. Contact: .
|
BLD-Framing/Rough-in | 4/25/2002 | 4/25/2002 | 4/25/2002 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 04/25/2002 at 09:03:59. Contact: . c/n -- ok to insulate. 4/25/2002 3:27:03 PM
|
BLD-Other | 4/8/2002 | 4/8/2002 | 4/8/2002 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 04/08/2002 at 07:38:04. Contact: .Shear 4/8/2002 2:35:34 PM
|
BLD-Other | 4/5/2002 | 4/5/2002 | 4/5/2002 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 04/05/2002 at 07:33:01. Contact: . Shear-1st floor only-2nd needs additional nailing -- call for re-inspect-- 4/5/2002 3:15:34 PM
|
BLD-Foundation | 3/11/2002 | 3/12/2002 | 3/12/2002 | A | PART |
Steven Webb
|
|
|
###-#### 95% ready--all but hd at time of inspection. 3/12/2002 9:25:30 AM
|
BLD-Footing | 3/8/2002 | 3/8/2002 | 3/8/2002 | P | PART |
Steven Webb
|
|
|
###-#### MIKE wip 3/8/2002 2:27:59 PM
|