BLD-Final | 7/30/2002 | 7/30/2002 | 7/30/2002 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 07/30/2002 at 09:18:37. Contact: . C. of C. #23294 issued. 7/30/2002 2:57:20 PM
|
BLD-Final | 7/29/2002 | 7/29/2002 | 7/29/2002 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 07/29/2002 at 09:15:04. Contact: .c/n on site dryer vent and drain covered with dirt onnorth wall 7/29/2002 2:31:31 PM
|
BLD-Wall cover | 4/19/2002 | 4/19/2002 | 4/19/2002 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 04/19/2002 at 07:59:20. Contact: .
|
BLD-Framing/Rough-in | 4/17/2002 | 4/18/2002 | 4/18/2002 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 04/17/2002 at 13:53:25. Contact: . ok to insulate 4/18/2002 10:30:03 AM
|
BLD-Other | 4/5/2002 | 4/5/2002 | 4/5/2002 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 04/05/2002 at 07:32:16. Contact: .
|
BLD-Other | 4/3/2002 | 4/3/2002 | 4/3/2002 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 04/03/2002 at 11:25:12. Contact: .shear nailing ok to cover ext 4/3/2002 4:58:45 PM
|
BLD-Foundation | 3/18/2002 | 3/18/2002 | 3/18/2002 | P | DONE |
Steven Webb
|
|
|
found wall chris ###-#### Already poured at time of inspection. 3/18/2002 2:15:10 PM
|
BLD-Footing | 3/15/2002 | 3/15/2002 | 3/15/2002 | P | PART |
Steven Webb
|
|
|
ft-re-insp chris ###-#### wip--5% ready at time of inspection. 3/15/2002 3:00:47 PM
|
BLD-Footing | 3/12/2002 | 3/12/2002 | 3/12/2002 | P | FAIL |
Steven Webb
|
|
|
###-#### RANDY Setbacks do not work with the house thumb print---refered to Angie--she will review and get back to me. Informed contractor and builder (Brighton) not to pour until situation is worked out. Setbacks were only 8'6" from sidewalk on street side and 13'6" rear. 3/12/2002 2:43:18 PM
|