BLD-Final | 5/11/2004 | 5/11/2004 | 5/11/2004 | A | PASS |
Dave Hannah
|
|
|
|
Permanent Occupancy | | 5/11/2004 | 5/11/2004 | | DONE |
|
|
|
|
BLD-Final | 2/24/2004 | 2/25/2004 | 2/25/2004 | A | PART |
Dave Hannah
|
|
|
RANDY; Phone #: ###-#### Internet Inspection Request from: Darla Downs ok for temp occ 2/25/2004 12:37:01 PM
|
FIRE-Final Inspection | 2/24/2004 | 2/25/2004 | 2/25/2004 | A | PASS |
Rick Jackson
|
|
|
RANDY; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Final | 2/23/2004 | 2/24/2004 | 2/24/2004 | A | CANC |
Dave Hannah
|
|
|
Dennis; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Final | 2/20/2004 | 2/23/2004 | 2/23/2004 | A | FAIL |
Dave Hannah
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Final | 2/19/2004 | 2/20/2004 | 2/20/2004 | A | FAIL |
Dave Hannah
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Final | 2/17/2004 | 2/18/2004 | 2/18/2004 | A | NR |
Dave Hannah
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
FIRE-Final Inspection | 2/17/2004 | 2/18/2004 | 2/18/2004 | A | FAIL |
Rick Jackson
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Annette Moore need signs on FACP and sprinkler room doors; signs in stairwells; extinguishers in lobby and fire pump room; lobby doors can't locked to trap people in lobby area; need extinguishers in penthouse rooms and on all floors; need smoke seals on all rated doors and they must latch; need to verify emergency lighting in corridors; stairwells and exit systems must be free of construction materials; update keys in knox box; complete elevator recall/shunt and sign-off 2/18/2004 3:43:01 PM 2/18/2004 3:44:55 PM
|
BLD-Final | 2/9/2004 | 2/9/2004 | 2/9/2004 | P | NR |
Dave Hannah
|
|
|
###-####
|
FIRE-Conference | 2/5/2004 | 2/6/2004 | 2/6/2004 | A | PART |
Rick Jackson
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Annette Moore reviewed exit sign placement and they are okay at current locations 2/6/2004 11:19:15 AM
|
BLD-Framing/Rough-in | 2/4/2004 | 2/4/2004 | 2/4/2004 | P | PART |
Dave Hannah
|
|
|
dennis ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Framing/Rough-in | 1/30/2004 | 1/30/2004 | 1/30/2004 | P | DONE |
Dave Hannah
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Framing/Rough-in | 11/25/2003 | 11/26/2003 | 11/26/2003 | A | PART |
Dave Hannah
|
|
|
###-#### randy
|
BLD-Framing/Rough-in | 11/26/2003 | 11/26/2003 | 11/26/2003 | P | CANC |
Dave Hannah
|
|
|
###-#### randy
|
BLD-Conference | 7/1/2003 | 7/1/2003 | 7/1/2003 | P | PASS |
Carl Dependahl
|
|
|
###-####, Randy,...replace drywall where mold present. 7/1/2003 5:24:33 PM
|
BLD-Framing/Rough-in | 6/27/2003 | 7/1/2003 | 7/1/2003 | A | FAIL |
Carl Dependahl
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Annette Moore....need firestops, show 1hr ass'ys w/ resilient channel, etc. 7/1/2003 5:33:29 PM
|
BLD-Framing/Rough-in | 6/27/2003 | 6/30/2003 | 6/30/2003 | A | PART |
Carl Dependahl
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Annette Moore....wip complete eng's fixes re notches, holes, etc. 6/30/2003 1:06:03 PM
|
BLD-Framing/Rough-in | 6/19/2003 | 6/19/2003 | 6/19/2003 | P | PART |
Carl Dependahl
|
|
|
4hr wall, wip...ok 6/19/2003 3:49:41 PM
|
BLD-Framing/Rough-in | 6/10/2003 | 6/12/2003 | 6/12/2003 | A | DONE |
Dave Hannah
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 6/12/2003 | 6/12/2003 | 6/12/2003 | P | DONE |
Dave Hannah
|
|
|
|
BLD-Conference | 5/21/2003 | 5/21/2003 | 5/21/2003 | A | PART |
Carl Dependahl
|
|
|
re shaft wall alternate may be ok w/ submittal of specs 5/21/2003 11:27:22 AM
|
BLD-Framing/Rough-in | 5/5/2003 | 5/9/2003 | 5/9/2003 | A | PART |
Carl Dependahl
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore..wip 5/9/2003 4:54:59 PM
|
BLD-Framing/Rough-in | 5/5/2003 | 5/8/2003 | 5/8/2003 | A | CANC |
Carl Dependahl
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 5/5/2003 | 5/7/2003 | 5/7/2003 | A | PART |
Carl Dependahl
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...4hr wall, rec'd eng's "ok" for ISI's eng'd design for framing. 5/7/2003 4:21:05 PM
|
BLD-Framing/Rough-in | 5/5/2003 | 5/6/2003 | 5/6/2003 | A | NR |
Carl Dependahl
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 5/1/2003 | 5/2/2003 | 5/5/2003 | A | PART |
Carl Dependahl
|
|
|
Bob...Wip, protect gyp from moisture. 5/5/2003 1:52:29 PM
|
BLD-Conference | 5/1/2003 | 5/1/2003 | 5/1/2003 | A | PASS |
Carl Dependahl
|
|
|
need eng'r of records ok for 4hr wall design ( by others) 5/1/2003 5:18:27 PM
|
BLD-Framing/Rough-in | 5/1/2003 | 5/1/2003 | 5/1/2003 | P | PART |
Carl Dependahl
|
|
|
4hr wall, need eng'rs ok for framing design...WIP to 3rd fl level 5/1/2003 5:19:48 PM
|
BLD-Framing/Rough-in | 4/27/2003 | 4/28/2003 | 4/28/2003 | A | PART |
Carl Dependahl
|
|
|
Bob, beginning 3rd fl...wip 4/28/2003 11:02:43 AM
|
BLD-Conference | 4/14/2003 | 4/14/2003 | 4/14/2003 | P | PASS |
Carl Dependahl
|
|
|
4hr walls...build wall per eng'g 4/14/2003 4:02:38 PM
|
BLD-Conference | 3/25/2003 | 3/25/2003 | 3/25/2003 | P | PASS |
Carl Dependahl
|
|
|
met arch onsite; c/n issued to provide q.c...eng'r to advise schedule of insps 3/25/2003 5:41:24 PM
|