Civic Plaza Apartments PA-2 * (Section 3 of 6) * To construct two four-hour area separation walls to divide this building into six separate buildings. This section is 5 stories and 20 units, @ 4,413 sq.ft. per floor, above a three-hour occupancy separation per UBC Section 311.2.2.1. NOTE: This building is fully fire sprinklered for story increase. All construction per the aproved plans, attached comment list and CABO/ANSI A117.9-1992. MJP PC#108-02 DRH01-00186 CUP01-00120
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/11/20045/11/20045/11/2004APASS
DetailsDave Hannah
Permanent Occupancy 5/11/20045/11/2004 DONE
Details
BLD-Final2/24/20042/25/20042/25/2004APART
DetailsDave Hannah
RANDY; Phone #: ###-#### Internet Inspection Request from: Darla Downs ok for temp occ 2/25/2004 12:37:17 PM
FIRE-Final Inspection2/24/20042/25/20042/25/2004APASS
DetailsRick Jackson
RANDY; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Final2/23/20042/24/20042/24/2004ACANC
DetailsDave Hannah
Dennis; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD-Final2/20/20042/23/20042/23/2004AFAIL
DetailsDave Hannah
dennis; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
Code Occupancy Approval  2/23/2004 PASS
BLD-Final2/19/20042/20/20042/20/2004AFAIL
DetailsTroy James
dennis; Phone #: ###-#### Internet Inspection Request from: Annette Moore
Checked doors for closure, seal and hardware. 2/20/2004 11:13:33 AM
FIRE-Final Inspection2/17/20042/18/20042/18/2004AFAIL
DetailsRick Jackson
randy; Phone #: ###-#### Internet Inspection Request from: Annette Moore need signs on FACP and sprinkler room doors; signs in stairwells; extinguishers in lobby and fire pump room; lobby doors can't locked to trap people in lobby area; need extinguishers in penthouse rooms and on all floors; need smoke seals on all rated doors and they must latch; need to verify emergency lighting in corridors; stairwells and exit systems must be free of construction materials; update keys in knox box; complete elevator recall/shunt and sign-off 2/18/2004 3:43:09 PM 2/18/2004 3:44:39 PM
BLD-Final2/9/20042/9/20042/9/2004PNR
DetailsDave Hannah
dennis; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in2/4/20042/4/20042/4/2004PPART
DetailsDave Hannah
dennis ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Framing/Rough-in1/30/20041/30/20041/30/2004PDONE
DetailsDave Hannah
dennis; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Framing/Rough-in1/30/20041/30/20041/30/2004PDONE
DetailsDave Hannah
dennis; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Aging Inspection8/25/20038/25/20038/25/2003 PASS
DetailsJim Storey
wip. 8/25/2003 10:06:14 AM
BLD-Framing/Rough-in6/23/20036/23/20036/23/2003PPART
DetailsCarl Dependahl
Pete; 4hr wall wip; add edge/corner tratment per GA file detail...ok to continue 6/24/2003 9:36:22 AM
BLD-Framing/Rough-in6/20/20036/20/20036/23/2003PNR
DetailsCarl Dependahl
alt shaft detail shown; allows const after shear wall panels placed/nailed; ok to proceed...hvac (vent/exhaust) shaft to be insp'd . 6/23/2003 9:53:01 AM
BLD-Conference6/19/20036/20/20036/20/2003APASS
DetailsCarl Dependahl
need revised shaft detail per GA? 6/20/2003 2:30:51 PM
BLD-Conference5/21/20035/21/20035/21/2003PPASS
DetailsCarl Dependahl
w/ isi foreman...submit alternate shaft design; 4hr wall wip ok. 5/21/2003 4:09:43 PM
BLD-Framing/Rough-in5/5/20035/9/20035/9/2003APART
DetailsCarl Dependahl
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...4hr wall, wip 5/9/2003 10:42:01 AM
BLD-Framing/Rough-in5/5/20035/8/20035/9/2003APART
DetailsCarl Dependahl
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore, prelim...wip 5/9/2003 11:55:11 AM
BLD-Framing/Rough-in5/5/20035/7/20035/7/2003APART
DetailsCarl Dependahl
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 4hr wall thru to 3rd fl; rec'd eng's ok for framing design. 5/7/2003 4:22:12 PM
BLD-Framing/Rough-in5/5/20035/6/20035/6/2003APART
DetailsCarl Dependahl
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore, 1st layer ok 5/6/2003 3:50:10 PM
BLD-Conference5/1/20035/2/20035/5/2003APASS
DetailsCarl Dependahl
met w/ ISI onsite 5/5/2003 2:03:15 PM
BLD-Framing/Rough-in5/1/20035/1/20035/1/2003APART
DetailsCarl Dependahl
ISI, 4hr wall, wip 5/1/2003 2:55:42 PM
BLD-Framing/Rough-in5/1/20035/1/20035/1/2003PPART
DetailsCarl Dependahl
Wip, 4hr wall to 3rd fl. 5/2/2003 2:39:52 PM
BLD-Framing/Rough-in4/18/20034/21/20034/21/2003APART
DetailsCarl Dependahl
observed "new" wall framing at 4hr wall per ISI's eng'g...need archs ok for revisions 4/21/2003 11:01:59 AM
BLD-Conference4/14/20034/14/20034/14/2003PPASS
DetailsCarl Dependahl
4hr walls...build wall per eng'g. 4/14/2003 4:02:59 PM
BLD-Conference3/25/20033/25/20033/25/2003PPASS
DetailsCarl Dependahl