Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD02-00376
StatusFinaled
Name CALDWELL CURTIS P
Site Address 1001 N 21ST ST
Project Name 
Customer Number 
ePlanReviewNo
Description
This project is for an extensive remodel and 2-story addition to an existing single family dwelling. The project has been fully engineered for lateral, and gravity loading. Extensive plans and engineering will dictate construction of this project and eng of record may be asked to verify connections for the inspection division. R-1C setbacks ok per rhj. All per the approved plans as marked and the attached engineering calcs and details attached and noted on plans. pep 4/24/2002 THIS PERMIT IS BEING MODIFIED TO INCLUDE THE RECONSTRUCTION OF THE DETACHED GARAGE ON THIS LOT AND ATTACHING SAME TO THE HOUSE WITH A 135S.F. FULLY SHEATHED AND ROOFED BREEZWAY. THE NEW ROOF STRUCTURE OF THE NOW ATTACHED GARAGE APPROVED BY AJB. IS ONLY ALLOWED 216S.F. OF USABLE SPACE IN THE ATTIC, AS TO ALLOW THAT THE BUILDING IS LESS THAN 1000S.F. ROOF TRUSSES IN THE APPROVED STORAGE AREA MUST BE DESIGNED TO MATCH THE APPROVED TRUSS DETAIL. ALL PER THE APPROVED PLANS AND DETAILS ATTACHED. vALUE ADDED TO THIS PERMIT IS TO BE $10,000 PEP 4/24/2002
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/9/200212/10/200212/10/2002PPASS
DetailsCarl Dependahl
curt ###-####
BLD-Final12/9/200212/9/200212/9/2002PFAIL
DetailsCarl Dependahl
###-#### CURT PLEASE CALL 1ST...need elecc interconnect for detectors working.. 12/9/2002 4:15:11 PM
BLD-Conference12/6/200212/6/200212/6/2002APASS
DetailsCarl Dependahl
all htg passed...interconnect detectors 12/6/2002 11:00:09 AM
BLD-Final12/4/200212/5/200212/5/2002ANR
DetailsCarl Dependahl
call 1st before insp -kirt; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie...need all mech permits finalled, notified owner. 12/5/2002 9:11:25 AM
BLD-Conference5/31/20025/31/20025/31/2002APASS
DetailsCarl Dependahl
need stamp on eng's detail for int chimney....has detail; install rails at rear ext. landing per 1003
BLD-Energy code compliance5/31/20025/31/20025/31/2002PPART
DetailsCarl Dependahl
###-####- ryan... floor area sheathed, upper deck floor insulated 5/31/2002 12:09:45 PM
BLD-Framing/Rough-in5/16/20025/17/20025/17/2002PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 05/16/2002 at 17:49:47. Contact: ###-####. eng letter with plans 5/20/2002 7:37:52 AM
BLD-Framing/Rough-in5/15/20025/16/20025/16/2002PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 05/15/2002 at 16:32:36. Contact: ###-####. garage area ok; awaiting engs report for truss/ shearwall connections & configuration...dont cover mstr bath / bedrm area until engr ok's; Also, interior "chimney" req's eng's design or construct per UBC w/ rebar, etc...chimney is extension of lower floor flue...flue req's support. 5/16/2002 4:38:46 PM
BLD-Energy code compliance5/13/20025/14/20025/14/2002APART
DetailsCarl Dependahl
###-#### RYAN FRAMING R/I AS WELL hr walls 5/14/2002 11:23:01 AM keep c/n, eng'r to walk-thru...add'l c/n re masonry chimney ties. 5/14/2002 12:54:20 PM
BLD-Framing/Rough-in5/14/20025/14/20025/14/2002APART
DetailsCarl Dependahl
garage & hse reinsp-frame...need eng's report/approval for drag strut truss: install roof/clg ties for masonry chimney extensions...do not cover that area; gar, main floor & library ok to cover.
BLD-Energy code compliance5/10/20025/13/20025/13/2002ACANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 05/10/2002 at 13:42:33. Contact: ###-####.
BLD-Framing/Rough-in5/10/20025/13/20025/13/2002ACANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 05/10/2002 at 13:43:11. Contact: ###-####.
BLD-Framing/Rough-in5/13/20025/13/20025/13/2002PNR
DetailsCarl Dependahl
Scheduled by Inspector: 407 On 5/13/2002 1:16:05 PM
BLD-Framing/Rough-in5/7/20025/7/20025/7/2002PPART
DetailsTony Young
fr ryan ###-#### re-insp
c/n still posted,,, ok to insulate house only 5/7/2002 2:06:17 PM
BLD-Framing/Rough-in5/3/20025/6/20025/6/2002ANR
DetailsCarl Dependahl
###-####
BLD-Framing/Rough-in5/3/20025/6/20025/6/2002ANR
DetailsCarl Dependahl
recall 5/6/2002 9:22:25 AM
BLD-Framing/Rough-in5/6/20025/6/20025/6/2002PFAIL
DetailsCarl Dependahl
###-#### RYAN c/n , air seal , fireblocks, straps, need eng's ok for modifications (int shearwall/truss connection & othe 5/6/2002 6:29:03 PM s 5/6/2002 6:29:12 PM
BLD-Framing/Rough-in5/2/20025/3/20025/3/2002PNR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 05/02/2002 at 12:53:31. Contact: ###-####.
BLD-Framing/Rough-in4/30/20025/1/20025/1/2002APART
DetailsDave Hannah
shear insp carl did inspection 5/1/2002 10:41:05 AM
BLD-Framing/Rough-in5/1/20025/1/20025/1/2002PPART
DetailsCarl Dependahl
ok to side only, need eng'g. ext. nailing ok only.
BLD-Framing/Rough-in4/30/20024/30/20024/30/2002PPART
DetailsCarl Dependahl
SHEER NAIL ###-#### RYAN
BLD-Framing/Rough-in4/26/20024/29/20024/29/2002ANR
DetailsCarl Dependahl
###-#### RYAN ADD HDWE. PER ENG'G, RECALL 4/29/2002 9:08:22 AM
BLD-Conference4/22/20024/23/20024/23/2002APASS
DetailsCarl Dependahl
###-####- RYAN consult P&Z, plan chk for permit for garage modification...this is a separate bldg from house remodel 4/23/2002 11:47:58 AM
BLD-Footing3/20/20023/21/20023/21/2002APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 03/20/2002 at 16:55:11. Contact: ###-####. Footing appears within min. setb 3/21/2002 10:09:13 AM
BLD-Footing3/14/20023/15/20023/15/2002AFAIL
DetailsCarl Dependahl
###-#### RYAN ; need soils test, min. 1500 psf per eng'd plans...appears to be some clay type soils w/ much organic mat'l. Also, need complete set approved plans 3/15/2002 9:40:23 AM