BLD-Final | 3/28/2006 | 3/28/2006 | 3/28/2006 | A | PASS |
Jim Sly
|
|
|
Previously finaled by 316
|
DOC - Permit Finaled | 3/28/2006 | 3/23/2006 | 3/28/2006 | P | PASS |
Jim Sly
|
|
|
Previously finaled by 316
|
BLD-Final | 5/13/2003 | 5/15/2003 | 5/15/2003 | A | PASS |
Jim Sly
|
|
|
bill; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
FIRE-Final Inspection | 5/13/2003 | 5/14/2003 | 5/14/2003 | A | PASS |
Troy Cobbley
|
|
|
fire life safety and fire sprinklers finaled 5/14/2003 9:19:26 AM
|
FIRE-Final Inspection | 5/7/2003 | 5/9/2003 | 5/9/2003 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled 5/9/2003 11:21:26 AM
|
BLD-Framing/Rough-in | 7/1/2002 | 7/1/2002 | 7/1/2002 | P | PASS |
Dave Hannah
|
|
|
JOHN ###-#### ok to cover after sprinkler r/i sign off 7/1/2002 3:52:13 PM
|
BLD-Footing | 5/13/2002 | 5/14/2002 | 5/14/2002 | A | PASS |
Dave Hannah
|
|
|
###-####
|
BLD-Footing | 5/9/2002 | 5/10/2002 | 5/10/2002 | A | FAIL |
Russ Owen
|
|
|
###-####. Need engineer to address the roof drain running through the footings. 5/10/2002 11:39:18 AM
|