Permit Information
Permit NumberBLD02-00437
StatusExpired
Name CHELTON FLIGHT SYSTEMS
Site Address 1109 W MAIN ST
Project NameOWYHEE PLAZA-5TH FLR
Customer Number 
ePlanReviewNo
Description
(CHELTON FLIGHTS SYSTEMS - OWYHEE PLAZA - 5TH FLR) This building is fire sprinklered under the provisions of the 1994 UCBC because it is too tall and has too many stories. To create a 4,955 square foot office tenant space on the 5th floor (actually the 6th floor) of the Owyhee Plaza. Because this building is historic, the 1994 UCBC shall be used to define code compliance. The existing core restrooms are being altered to be accesssible to the disabled. Work is to include interior nonbearing walls, interior doors and windows, suspended ceilings, and interior finishes. Access from the common core area to the West stairway will be through this tenant space. Locking hardware shall never obstruct exit access through this tenant space. Egress through this tenant space shall not be obstructed in any way. The fire sprinkler system on this floor shall comply with NFPA 13-1999 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference2/25/20052/25/20052/25/2005APASS
DetailsDave Hannah
ok to final 2/25/2005 11:52:01 AM
BLD-Aging Inspection2/24/20042/24/20042/24/2004 DONE
DetailsDave Hannah
BLD-Aging Inspection8/8/20038/8/20038/8/2003 DONE
DetailsCarl Dependahl
called, no response 8/8/2003 2:51:59 PM
FIRE-Conference6/11/20026/11/20026/11/2002APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 06/11/2002 at 07:09:38. Contact: ###-####. met with Jim; sprinklers required in concealed combustible spaces above estrooms and electrical room 6/11/2002 10:14:11 AM
BLD-Framing/Rough-in6/10/20026/10/20026/10/2002APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 06/10/2002 at 07:13:28. Contact: ###-####. RESTROOMS, HALL CLOSETS OK PENDING TRADES INSP...WALLS ONLY. 6/10/2002 11:46:41 AM
BLD-Final5/9/20025/10/20025/9/2002ACANC
DetailsJim Storey
out of time
BLD-Final5/9/20025/9/20025/9/2002ANR
DetailsCarl Dependahl
5th floorout of time on 5/9 301...nr, install doors, hdwe...patch/seal lid or walls as needed, install extinguishers. ok to place fixtures/furnishings. Restrooms considered as phase 2. 5/10/2002 11:33:37 AM
BLD-Final5/9/20025/9/20025/9/2002PCANC
DetailsJim Storey
5TH FLOOR FOR OCCP. ###-#### JIM PLEASE CALL 1ST out of time 5/9/2002 5:41:55 PM
FIRE-Final Inspection5/9/20025/9/20025/9/2002PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 05/09/2002 at 07:53:25. Contact: ###-####. okay to occupy rooms 509-529; phasing of this project is needed to complete bathrooms and hallway 5/9/2002 2:55:58 PM
BLD-Framing/Rough-in4/29/20024/30/20024/30/2002APART
DetailsTom Arcoraci
ceiling grid--jim- ###-#### grid ok 4/30/2002 11:37:01 AM
BLD-Framing/Rough-in4/12/20024/12/20024/12/2002PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 04/12/2002 at 08:36:01. Contact: ###-####. ok to cover office areas bath rooms not ready 4/12/2002 2:09:54 PM