DOC - Permit Expired | 3/25/2008 | 3/25/2008 | 3/25/2008 | P | PASS |
Jim Storey
|
|
|
R105.5 Expiration. Every permit issued shall become invalid unless the work authorized by such permit is commenced within 180 days after its issuance, or if the work authorized by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. The building official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each. The extension shall be requested in writing and justifiable cause demonstrated.
|
BLD-Final | 8/15/2002 | 8/16/2002 | 8/16/2002 | A | CANC |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/15/2002 at 10:52:46. Contact: ###-####. Cancelled by contractor--will re-call. 8/16/2002 8:58:54 AM
|
BLD-Wall cover | 4/22/2002 | 4/23/2002 | 4/23/2002 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 04/22/2002 at 16:38:26. Contact: ###-####.
|
BLD-Framing/Rough-in | 4/19/2002 | 4/23/2002 | 4/22/2002 | A | CANC |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 04/19/2002 at 15:27:07. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 04/22/2002 at 09:32:32.
|
BLD-Framing/Rough-in | 4/22/2002 | 4/22/2002 | 4/22/2002 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 04/22/2002 at 08:07:27. Contact: ###-####. c/n--ok to insulate 4/22/2002 3:24:20 PM
|
BLD-Energy code compliance | 4/18/2002 | 4/19/2002 | 4/19/2002 | P | DONE |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 04/18/2002 at 13:42:55. Contact: ###-####. Air seal not energy--still needs framing. 4/19/2002 4:02:32 PM
|
BLD-Framing/Rough-in | 4/8/2002 | 4/8/2002 | 4/8/2002 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 04/08/2002 at 07:33:07. Contact: .SHEAR--ok to side 4/8/2002 4:08:50 PM
|
BLD-Framing/Rough-in | 4/5/2002 | 4/5/2002 | 4/5/2002 | P | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 04/05/2002 at 08:12:37. Contact: . SHEAR--C/N posted on site-Do not side. 4/5/2002 3:34:00 PM
|
BLD-Foundation | 3/19/2002 | 3/19/2002 | 3/19/2002 | P | PART |
Steven Webb
|
|
|
Scheduled by Inspector: 420 On 3/19/2002 12:54:02 PM wip 3/20/2002 7:32:27 AM
|
BLD-Foundation | 3/18/2002 | 3/18/2002 | 3/18/2002 | P | PART |
Steven Webb
|
|
|
###-#### FOOTING--wip 3/18/2002 3:14:22 PM
|
BLD-Foundation | 3/8/2002 | 3/12/2002 | 3/12/2002 | P | CANC |
Steven Webb
|
|
|
###-####
|
BLD-Footing | 3/8/2002 | 3/11/2002 | 3/11/2002 | P | CANC |
Steven Webb
|
|
|
###-#### Cancelled by contractor--to wet to pour. 3/11/2002 3:18:06 PM
|
BLD-Footing | 3/6/2002 | 3/7/2002 | 3/7/2002 | A | NR |
Steven Webb
|
|
|
###-#### Rain caused to much mud to form and pour. 3/7/2002 8:48:25 AM
|
BLD-Foundation | 3/6/2002 | 3/7/2002 | 3/7/2002 | P | NR |
Steven Webb
|
|
|
WALL\\###-####
|