Permit Information
Permit NumberBLD02-00440
StatusExpired
Name DALE COOK
Site Address 5980 S SETTLEMENT WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
This project is for the addition of an 800s.f. clear story to an existing 2658s.f. single family dwelling. R-1B setbacks ok per rhj. All per the approved plans as marked and attached. Smoke detectors per UBC 310.9 are required. pep
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Expired3/25/20083/25/20083/25/2008PPASS
DetailsJim Storey
R105.5 Expiration.
Every permit issued shall become invalid unless the work authorized by such permit is commenced within 180 days after its issuance, or if the work authorized by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. The building official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each. The extension shall be requested in writing and justifiable cause demonstrated.
BLD-Final8/15/20028/16/20028/16/2002ACANC
DetailsSteven Webb
Scheduled by a contractor via Hello! on 08/15/2002 at 10:52:46. Contact: ###-####. Cancelled by contractor--will re-call. 8/16/2002 8:58:54 AM
BLD-Wall cover4/22/20024/23/20024/23/2002PPASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 04/22/2002 at 16:38:26. Contact: ###-####.
BLD-Framing/Rough-in4/19/20024/23/20024/22/2002ACANC
DetailsSteven Webb
Scheduled by a contractor via Hello! on 04/19/2002 at 15:27:07. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 04/22/2002 at 09:32:32.
BLD-Framing/Rough-in4/22/20024/22/20024/22/2002PPART
DetailsSteven Webb
Scheduled by a contractor via Hello! on 04/22/2002 at 08:07:27. Contact: ###-####. c/n--ok to insulate 4/22/2002 3:24:20 PM
BLD-Energy code compliance4/18/20024/19/20024/19/2002PDONE
DetailsSteven Webb
Scheduled by a contractor via Hello! on 04/18/2002 at 13:42:55. Contact: ###-####. Air seal not energy--still needs framing. 4/19/2002 4:02:32 PM
BLD-Framing/Rough-in4/8/20024/8/20024/8/2002PPART
DetailsSteven Webb
Scheduled by a contractor via Hello! on 04/08/2002 at 07:33:07. Contact: .SHEAR--ok to side 4/8/2002 4:08:50 PM
BLD-Framing/Rough-in4/5/20024/5/20024/5/2002PFAIL
DetailsSteven Webb
Scheduled by a contractor via Hello! on 04/05/2002 at 08:12:37. Contact: . SHEAR--C/N posted on site-Do not side. 4/5/2002 3:34:00 PM
BLD-Foundation3/19/20023/19/20023/19/2002PPART
DetailsSteven Webb
Scheduled by Inspector: 420 On 3/19/2002 12:54:02 PM wip 3/20/2002 7:32:27 AM
BLD-Foundation3/18/20023/18/20023/18/2002PPART
DetailsSteven Webb
###-#### FOOTING--wip 3/18/2002 3:14:22 PM
BLD-Foundation3/8/20023/12/20023/12/2002PCANC
DetailsSteven Webb
###-####
BLD-Footing3/8/20023/11/20023/11/2002PCANC
DetailsSteven Webb
###-#### Cancelled by contractor--to wet to pour. 3/11/2002 3:18:06 PM
BLD-Footing3/6/20023/7/20023/7/2002ANR
DetailsSteven Webb
###-#### Rain caused to much mud to form and pour. 3/7/2002 8:48:25 AM
BLD-Foundation3/6/20023/7/20023/7/2002PNR
DetailsSteven Webb
WALL\\###-####