BLD-Final | 5/31/2002 | 6/3/2002 | 6/3/2002 | A | PASS |
Jim Sly
|
|
|
DEBBIE ###-#### C/C issued. 6/3/2002 11:40:56 AM
|
BLD-Energy code compliance | 4/5/2002 | 4/8/2002 | 4/8/2002 | P | PASS |
Jim Sly
|
|
|
###-#### debbie
|
BLD-Framing/Rough-in | 4/4/2002 | 4/5/2002 | 4/5/2002 | P | FAIL |
Jim Sly
|
|
|
###-#### C/N posted. 4/5/2002 12:38:55 PM
|
BLD-Framing/Rough-in | 3/25/2002 | 3/27/2002 | 3/27/2002 | P | PART |
Jim Sly
|
|
|
SHEER INSPECT ###-#### DEBBIE Shear OK. 3/27/2002 4:09:05 PM
|
BLD-Foundation | 3/13/2002 | 3/13/2002 | 3/13/2002 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 03/13/2002 at 07:08:16. Contact: ###-####.
|
BLD-Footing | 3/12/2002 | 3/12/2002 | 3/12/2002 | P | PART |
Tom Arcoraci
|
|
|
rob- ###-####--ft wip 3/12/2002 2:01:26 PM
|