BLD-Final | 5/2/2002 | 5/3/2002 | 5/3/2002 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 05/02/2002 at 13:38:43. Contact: ###-####. ok for perm occ 5/3/2002 10:13:54 AM
|
Permanent Occupancy | | 5/3/2002 | 5/3/2002 | | DONE |
|
|
|
|
BLD-Final | 4/30/2002 | 5/1/2002 | 5/1/2002 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 04/30/2002 at 09:38:36. Contact: ###-####. ok for temp occ water closet to close to wall need a sign at rest room 5/1/2002 2:45:06 PM
|
FIRE-Final Inspection | 4/30/2002 | 5/1/2002 | 5/1/2002 | A | FAIL |
Troy Cobbley
|
|
|
Provide suite number, provide fire extinguisher and provide ADA approved hardware on restroom door 5/1/2002 9:12:11 AM
|
BLD-Other | 4/25/2002 | 4/26/2002 | 4/26/2002 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 04/25/2002 at 11:14:47. Contact: ###-####. ceiling grid every thing ok but for two walls need runners wired up 4/26/2002 2:14:34 PM
|
BLD-Framing/Rough-in | 4/11/2002 | 4/12/2002 | 4/12/2002 | P | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 04/11/2002 at 15:27:24. Contact: ###-####.
|
BLD-Framing/Rough-in | 4/10/2002 | 4/11/2002 | 4/11/2002 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 04/10/2002 at 15:41:48. Contact: ###-####.ok to cover int walls after elec r/i is passed 4/11/2002 4:05:35 PM
|