Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD02-00484
StatusFinaled
Name PAPA MURPHY'S
Site Address 10545 W OVERLAND RD
Project NameCOUNTRY SQUARE SHOPPING CENTER
Customer Number 
ePlanReviewNo
Description
(PAPA MURPHY'S)(COUNTRY SQUARE SHOPPING CENTER) To construct a drive through window on south side of building, remodel the interior food prep area and miscellaneous finish per approved plans on file. No plumbing involved in this remodel. CUP01-00173/DRH01-00244
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/24/20027/24/20027/24/2002APASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 07/24/2002 at 06:51:31. Contact: ###-####.ok for a perm oc no card on site. 7/24/2002 10:33:06 AM
Permanent Occupancy 7/24/20027/24/2002 DONE
Details
Code Occupancy Approval  7/22/2002 PASS
OK FINAL SIGNED OFF.
BLD-Final7/15/20027/15/20027/15/2002PFAIL
DetailsRuss Owen
###-####, safey glass at stairs and all signatures. 7/15/2002 4:21:48 PM
FIRE-Final Inspection7/15/20027/15/20027/15/2002PPASS
DetailsTroy Cobbley
Fire life/safety finaled 7/15/2002 2:33:24 PM
FIRE-Final Inspection7/5/20027/5/20027/5/2002PFAIL
DetailsRick Jackson
DENNIS ###-#### repair exit signs; rear exit door hardware; "door to remain onlocked..." sign at main exit; verify annual sprinkler system inspection; tamper on wall PIV tampered but not wired - need to verify the alarm monitoring if over 100 heads 7/5/2002 2:29:15 PM
BLD-Framing/Rough-in6/7/20026/7/20026/7/2002PPASS
DetailsRuss Owen
fr ###-####- dennis
BLD-Framing/Rough-in6/5/20026/6/20026/6/2002PFAIL
DetailsRuss Owen
###-####needs 2 hds at shear panel. 6/6/2002 5:46:22 PM
BLD-Framing/Rough-in6/4/20026/4/20026/4/2002PFAIL
DetailsRuss Owen
DUTCH ###-#### SHEER NAIL . posted c/n . 6/4/2002 4:27:43 PM
BLD-Foundation5/13/20025/14/20025/14/2002APASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 05/13/2002 at 22:02:45. Contact: ###-####.
BLD-Foundation5/11/20025/13/20025/13/2002PFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 05/11/2002 at 07:57:59. Contact: ###-####.Went back to a mono pour, but not yet complete , talked with contractor will recall. 5/13/2002 2:26:45 PM
BLD-Foundation5/10/20025/10/20025/10/2002PFAIL
DetailsRuss Owen
DENNIS ###-#### c/n posted plan indicates a mono pour and they have planed to do a 2 part. 5/10/2002 5:21:21 PM
FIRE-Conference4/26/20024/26/20024/26/2002PDONE
DetailsTroy Cobbley
spoke with the owner about fire extinguisher placement, door hardware, exit signs, sprinkler coverage, and fire rated construction as per note 12 in the building review
BLD-Foundation4/17/20024/18/20024/18/2002PNR
DetailsRuss Owen
###-####