BLD-Final | 8/20/2002 | 8/20/2002 | 8/20/2002 | P | PASS |
Jim Storey
|
|
|
call first so Mike can meet you there 20 min. prior ###-#### or ###-####
|
BLD-Energy code compliance | 4/11/2002 | 4/11/2002 | 4/11/2002 | P | PASS |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 4/11/2002 | 4/11/2002 | 4/11/2002 | P | CANC |
Jim Storey
|
|
|
###-#### performed previously by d hanna. 4/11/2002 2:57:14 PM
|
BLD-Conference | 4/3/2002 | 4/4/2002 | 4/4/2002 | A | DONE |
Dave Hannah
|
|
|
###-#### greg made some changes to roof framing they got ok from engineer also still with in conv framing practices ok to cont 4/4/2002 11:24:11 AM
|
BLD-Footing | 3/20/2002 | 3/21/2002 | 3/21/2002 | A | PASS |
Jim Storey
|
|
|
ft insp mike- ###-#### ft ok rebar ok. 3/21/2002 11:15:10 AM
|