BLD-Grading Inspection | 10/2/2002 | 10/2/2002 | 10/2/2002 | | PASS |
Rita DeYoung
|
|
|
Final grading and drainage is complete and approved.
|
BLD-Final | 9/27/2002 | 9/30/2002 | 9/30/2002 | A | PASS |
Tony Young
|
|
|
CALL FIRST PLEASE ; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|
BLD-Framing/Rough-in | 6/17/2002 | 6/17/2002 | 6/17/2002 | P | PASS |
Tony Young
|
|
|
fr insp dwayne- ###-####
|
BLD-Energy code compliance | 6/12/2002 | 6/13/2002 | 6/13/2002 | P | PASS |
Tony Young
|
|
|
###-#### DUANE
|
BLD-Framing/Rough-in | 6/10/2002 | 6/10/2002 | 6/10/2002 | P | PART |
Tony Young
|
|
|
fr insp- dwayne- ###-####
c/n posted, ok to insulate, need truss specs 6/10/2002 1:23:44 PM
|
BLD-Framing/Rough-in | 6/3/2002 | 6/4/2002 | 6/4/2002 | P | PART |
Tony Young
|
|
|
shear ###-#### -dwayne
shear ok 6/4/2002 4:39:56 PM
|
BLD-Other | 5/29/2002 | 5/30/2002 | 5/30/2002 | A | CANC |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 05/29/2002 at 11:36:40. Contact: ###-####.--shear nail insp
|
BLD-Other | 5/30/2002 | 5/30/2002 | 5/30/2002 | P | CANC |
Tony Young
|
|
|
|
BLD-Other | 5/30/2002 | 5/30/2002 | 5/30/2002 | P | FAIL |
Steven Webb
|
|
|
C/N posted--SHEAR--several items on c/n. Do not side. 5/30/2002 1:17:39 PM
|
BLD-Other | 5/30/2002 | 5/30/2002 | 5/30/2002 | P | CANC |
Steven Webb
|
|
|
|
BLD-Foundation | 5/7/2002 | 5/7/2002 | 5/7/2002 | P | PART |
Steven Webb
|
|
|
###-#### JERRY wip--75% ready at time of inspection. 5/7/2002 1:29:37 PM
|
BLD-Grading Inspection | 5/6/2002 | 5/6/2002 | 5/6/2002 | | PASS |
Rita DeYoung
|
|
|
Geotechnical engineer has approved the footing subgrade.
|
BLD-Footing | 5/3/2002 | 5/3/2002 | 5/3/2002 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 05/03/2002 at 06:22:14. Contact: ###-####. wip 5/3/2002 10:09:50 AM
|