BLD-Final | 10/8/2002 | 10/8/2002 | 10/8/2002 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/08/2002 at 07:37:13. Contact: ###-####. C/C issued. 10/8/2002 3:46:08 PM
|
BLD-Energy code compliance | 4/10/2002 | 4/12/2002 | 4/12/2002 | P | PASS |
Jim Sly
|
|
|
###-#### DAVE Frame pass. 4/12/2002 2:15:19 PM
|
BLD-Energy code compliance | 4/11/2002 | 4/12/2002 | 4/12/2002 | P | PASS |
Jim Sly
|
|
|
###-#### dave
|
BLD-Framing/Rough-in | 4/10/2002 | 4/11/2002 | 4/11/2002 | P | FAIL |
Jim Sly
|
|
|
###-#### DAVE C/N posted 4/11/2002 3:48:55 PM
|
BLD-Conference | 3/26/2002 | 3/26/2002 | 3/26/2002 | P | CANC |
Dave Hannah
|
|
|
Scheduled by Inspector: 425 On 3/26/2002 1:03:59 PM
|
BLD-Foundation | 3/26/2002 | 3/26/2002 | 3/26/2002 | P | PASS |
Dave Hannah
|
|
|
Scheduled by Inspector: 425 On 3/26/2002 1:06:07 PM
|
BLD-Foundation | 3/25/2002 | 3/26/2002 | 3/26/2002 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 03/25/2002 at 17:47:54. Contact: ###-####.
|
BLD-Footing | 3/25/2002 | 3/25/2002 | 3/25/2002 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 03/25/2002 at 10:39:51. Contact: ###-####.
|