BLD-Final | 7/1/2002 | 7/1/2002 | 7/1/2002 | P | PASS |
Steven Webb
|
|
|
TERRY ###-#### C. of C. #22460 issued. 7/1/2002 3:37:39 PM
|
BLD-Final | 6/27/2002 | 6/28/2002 | 6/28/2002 | A | FAIL |
Steven Webb
|
|
|
terry ###-#### fn C/N posted 6/28/2002 10:13:46 AM
|
BLD-Energy code compliance | 5/10/2002 | 5/10/2002 | 5/10/2002 | P | CANC |
Steven Webb
|
|
|
TERRY ###-####
|
BLD-Energy code compliance | 5/10/2002 | 5/10/2002 | 5/10/2002 | P | PASS |
Steven Webb
|
|
|
terry--###-#### Ok to cover 5/10/2002 2:16:15 PM
|
BLD-Framing/Rough-in | 5/10/2002 | 5/10/2002 | 5/10/2002 | P | PASS |
Steven Webb
|
|
|
fr -insp terry--###-#### Corrections completed. 5/10/2002 2:15:56 PM
|
BLD-Framing/Rough-in | 5/6/2002 | 5/7/2002 | 5/7/2002 | A | PART |
Steven Webb
|
|
|
###-#### terry C/N posted--ok to insulate. 5/7/2002 9:19:54 AM
|
BLD-Framing/Rough-in | 4/22/2002 | 4/22/2002 | 4/22/2002 | P | PART |
Steven Webb
|
|
|
shear nail terry- ###-#### Shear--ok to side--missing hd at rear/c/n issued--verify at framing. 4/22/2002 3:40:11 PM
|
BLD-Framing/Rough-in | 4/17/2002 | 4/18/2002 | 4/18/2002 | P | FAIL |
Steven Webb
|
|
|
###-#### SHEAR--c/n posted in garage--do not side. 4/18/2002 2:14:30 PM
|
BLD-Foundation | 3/28/2002 | 3/29/2002 | 3/29/2002 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/28/2002 at 07:23:15. Contact: ###-####. wip 3/29/2002 9:29:08 AM
|
BLD-Footing | 3/28/2002 | 3/28/2002 | 3/28/2002 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/28/2002 at 07:22:24. Contact: ###-####.
|