BLD-Final | 1/21/2003 | 1/21/2003 | 1/21/2003 | P | NR |
Tom Arcoraci
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|
BLD-Final | 1/17/2003 | 1/17/2003 | 1/17/2003 | P | FAIL |
Jim Sly
|
|
|
elliot--for 3261 wildwood; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie NR 1/17/2003 4:52:48 PM
|
BLD-Framing/Rough-in | 9/17/2002 | 9/19/2002 | 9/19/2002 | A | PASS |
Dave Hannah
|
|
|
###-#### insulation ok framing c/n done ok to cover 9/19/2002 11:40:57 AM
|
BLD-Framing/Rough-in | 9/11/2002 | 9/12/2002 | 9/12/2002 | A | FAIL |
Dave Hannah
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung c/n on site ok to insulate 9/12/2002 12:18:34 PM
|
BLD-Framing/Rough-in | 8/21/2002 | 8/22/2002 | 8/22/2002 | A | FAIL |
Dave Hannah
|
|
|
ELLIET; Phone #: ###-#### c/n on site ok to insulate 8/22/2002 12:47:28 PM
|
BLD-Framing/Rough-in | 8/16/2002 | 8/16/2002 | 8/16/2002 | P | PART |
Dave Hannah
|
|
|
shear walls ok to cover ext all but for back wall ok to cover after engin ok 8/19/2002 11:55:32 AM
|
BLD-Framing/Rough-in | 8/15/2002 | 8/15/2002 | 8/15/2002 | P | FAIL |
Dave Hannah
|
|
|
###-#### need engineer to evaluate shear panels on back wall restaple areas on panels 8/15/2002 5:20:24 PM
|
BLD-Framing/Rough-in | 7/29/2002 | 7/30/2002 | 7/30/2002 | A | PART |
Dave Hannah
|
|
|
clint; Phone #: ###-#### 1hr firwe walls 1st and second floors ok 7/30/2002 9:09:14 AM
|
BLD-Foundation | 7/10/2002 | 7/11/2002 | 7/11/2002 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 07/10/2002 at 07:17:30. Contact: ###-####.poured at time of inspection. 7/11/2002 5:35:06 PM
|
BLD-Footing | 7/10/2002 | 7/10/2002 | 7/10/2002 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 07/10/2002 at 07:17:02. Contact: ###-####. set backs ok forms at about 75 % no rebar installed 7/10/2002 2:53:03 PM
|