BLD-Final | 8/7/2002 | 8/8/2002 | 8/8/2002 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/07/2002 at 14:18:19. Contact: ###-####. C. of C. #23300 issued. 8/8/2002 10:19:49 AM
|
BLD-Energy code compliance | 6/5/2002 | 6/5/2002 | 6/5/2002 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 6/4/2002 | 6/5/2002 | 6/5/2002 | A | PASS |
Dave Hannah
|
|
|
CLINT ###-####
|
BLD-Framing/Rough-in | 6/3/2002 | 6/4/2002 | 6/4/2002 | A | PART |
Steven Webb
|
|
|
###-#### clint C/N posted--Lifted Stop Work-ok to insulate. 6/4/2002 9:59:46 AM
|
BLD-Framing/Rough-in | 6/3/2002 | 6/3/2002 | 6/3/2002 | P | FAIL |
Steven Webb
|
|
|
CLINT ###-#### C/N and stop work order--House was being insulated-85% completed--No framing had been performed--Instructed via c/n for insulation to be removed and to call for re-inspection. 6/3/2002 2:48:41 PM
|
BLD-Framing/Rough-in | 5/23/2002 | 5/24/2002 | 5/24/2002 | A | PART |
Steven Webb
|
|
|
CLENT ###-#### SHEER NAIL --Ext. ok---interior panels in garage needed, will verify at framing. 5/24/2002 11:57:18 AM
|
BLD-Framing/Rough-in | 5/3/2002 | 5/3/2002 | 5/3/2002 | P | PART |
Steven Webb
|
|
|
STEM WALL ###-#### ERIC wip--Not framing--foundational wall 5/3/2002 1:56:35 PM
|
BLD-Footing | 5/1/2002 | 5/1/2002 | 5/1/2002 | P | PART |
Steven Webb
|
|
|
LATE PM ###-#### wip 5/1/2002 4:09:19 PM
|