BLD-Final | 7/23/2002 | 7/24/2002 | 7/24/2002 | A | PASS |
Alan Hauser
|
|
|
c/c #21627 7/24/2002 10:49:14 AM
|
BLD-Energy code compliance | 6/4/2002 | 6/5/2002 | 6/5/2002 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 06/04/2002 at 16:24:10. Contact: ###-####.
|
BLD-Framing/Rough-in | 5/31/2002 | 6/3/2002 | 6/3/2002 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 05/31/2002 at 08:02:25. Contact: ###-####.c/n on site ok to insulate shear bracing ok all but for garage front 6/3/2002 10:04:10 AM
|
BLD-Conference | 5/16/2002 | 5/16/2002 | 5/16/2002 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 05/16/2002 at 10:55:37. Contact: ###-####.
conf. on winder stairs, need to have same tread 12" out measured w/in 22 deg? arc and have min 6" tread at finished stair 5/16/2002 3:03:48 PM
|
BLD-Other | 5/13/2002 | 5/13/2002 | 5/13/2002 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 05/13/2002 at 09:23:16. Contact: ###-####.main floor fire wall, duplex built 5/14/2002 9:29:44 AM
|
BLD-Foundation | 4/26/2002 | 4/29/2002 | 4/29/2002 | P | PART |
Tony Young
|
|
|
found jed ###-#### for both duplex
|
BLD-Footing | 4/23/2002 | 4/24/2002 | 4/24/2002 | P | PART |
Tony Young
|
|
|
###-#### JED
wip, ok so far,,, plans are in white posts 4/24/2002 1:19:32 PM
|