DOC - Permit Finaled | | | 10/6/2003 | | DONE |
|
|
|
|
BLD-Final | 12/19/2002 | 12/20/2002 | 12/20/2002 | A | PASS |
Dave Hannah
|
|
|
###-#### please call ed 1st c.c issued 12/20/2002 5:10:26 PM
|
BLD-Grading Inspection | 12/18/2002 | 12/18/2002 | 12/18/2002 | | BOND |
Rita DeYoung
|
|
|
Rough grading is complete and satisfactory. Fine grading and revegetation must still be done. The engineer has recommended a $500.00 bond to ensure satisfactory completion. Upon receipt of the bond the grading and drainage are conditionally approved
|
BLD-Energy code compliance | 10/21/2002 | 10/22/2002 | 10/22/2002 | A | PASS |
Tony Young
|
|
|
ED ###-#### TONY PLEASE CALL BEFORE GOING AS ED WOULD LIKE TO MEET YOU THERE..
|
BLD-Energy code compliance | 10/18/2002 | 10/21/2002 | 10/21/2002 | A | CANC |
Jim Sly
|
|
|
###-#### call ed first he wants to meet you there Cancelled by dan. 10/21/2002 8:30:47 AM
|
BLD-Energy code compliance | 10/18/2002 | 10/21/2002 | 10/21/2002 | A | CANC |
Jim Sly
|
|
|
###-#### call ed first he wants to meet you there CANC INSPECTION UNTIL 10-22-02
|
BLD-Energy code compliance | 10/18/2002 | 10/21/2002 | 10/21/2002 | A | CANC |
Jim Sly
|
|
|
###-#### call ed first he wants to meet you there Cancelled by dan. 10/21/2002 8:30:47 AM
|
BLD-Framing/Rough-in | 10/14/2002 | 10/15/2002 | 10/15/2002 | A | FAIL |
Tony Young
|
|
|
###-#### ed please call for access
c/n posted, ok to insulate 10/15/2002 2:24:06 PM
|
BLD-Framing/Rough-in | 10/15/2002 | 10/15/2002 | 10/15/2002 | P | FAIL |
Tony Young
|
|
|
call ed 1st
see c/n 10/15/2002 2:57:00 PM
|
BLD-Framing/Rough-in | 9/17/2002 | 9/19/2002 | 9/19/2002 | P | FAIL |
Tony Young
|
|
|
###-#### eddie
shear only, c/n posted 9/19/2002 3:56:53 PM
|
BLD-Foundation | 6/10/2002 | 6/10/2002 | 6/10/2002 | P | PART |
Tony Young
|
|
|
rebar insp john- ###-####
final block height 6/10/2002 1:58:02 PM
|
BLD-Concrete | 6/4/2002 | 6/4/2002 | 6/4/2002 | P | PART |
Dave Hannah
|
|
|
before 2 ###-#### masonry wall first lift 6/4/2002 1:24:55 PM
|
BLD-Foundation | 5/22/2002 | 5/23/2002 | 5/23/2002 | P | PART |
Tony Young
|
|
|
###-#### donny
|
BLD-Conference | 5/17/2002 | 5/22/2002 | 5/22/2002 | A | PASS |
Tony Young
|
|
|
height of building ok as approved plans per scott in p/z 5/23/2002 1:20:41 PM
|
BLD-Foundation | 5/20/2002 | 5/21/2002 | 5/21/2002 | A | PART |
Tony Young
|
|
|
###-####- donny found
wip, retaining/stem walls 5/21/2002 1:01:47 PM
|
BLD-Conference | 5/16/2002 | 5/16/2002 | 5/16/2002 | P | PART |
Tony Young
|
|
|
###-####- kecia for conf-call 1st before insp
height concerns, t/w eddie danials arch. and contractor, said he is going to get me a set of plans to go over w/ p/z, said he has talked w/ p/z and is ok w/ average roof height per p/z,,, NEED TO KEEP CLOSE CONTACT W/ ALL PARTIES INVOLVED including neighbors on both sides 5/17/2002 8:59:06 AM
|
BLD-Footing | 5/6/2002 | 5/7/2002 | 5/7/2002 | A | PART |
Tony Young
|
|
|
###-#### DONNY
|
BLD-Footing | 5/7/2002 | 5/7/2002 | 5/7/2002 | P | PART |
Tony Young
|
|
|
donnie ###-#### 5/7/2002 11:34:31 AM
|
BLD-Footing | 5/7/2002 | 5/7/2002 | 5/7/2002 | P | DONE |
Steven Webb
|
|
|
donnie ###-#### 5/7/2002 11:34:31 AM--Already poured at time of inspection. 5/7/2002 12:43:33 PM
|
BLD-Grading Inspection | 5/1/2002 | 5/1/2002 | 5/1/2002 | | PASS |
Rita DeYoung
|
|
|
Footing subgrade has been approved by the geotechnical engineer.
|