BLD-Final | 6/10/2002 | 6/11/2002 | 6/11/2002 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 06/10/2002 at 21:51:09. Contact: ###-####. PER DIRECTOR AND PLAN REVIEW 6/11/2002 9:41:41 AM
|
BLD-Final | 6/9/2002 | 6/10/2002 | 6/10/2002 | P | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 06/09/2002 at 21:20:32. Contact: ###-####. needs landing 6/10/2002 2:24:22 PM
|
BLD-Framing/Rough-in | 5/9/2002 | 5/10/2002 | 5/10/2002 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 05/09/2002 at 19:03:52. Contact: ###-####. per director 5/10/2002 10:20:20 AM
|
BLD-Framing/Rough-in | 5/8/2002 | 5/9/2002 | 5/9/2002 | A | NH |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/08/2002 at 21:15:43. Contact: ###-####.
|
BLD-Conference | 4/22/2002 | 4/22/2002 | 4/22/2002 | P | PASS |
Tom Arcoraci
|
|
|
Added by Inspector: 408 On 4/22/2002 2:49:59 PM meet with tony reed building code issues wiil be resolved per tim hoglands instructions
|
BLD-Conference | 4/19/2002 | 4/19/2002 | 4/19/2002 | P | FAIL |
Tom Arcoraci
|
|
|
Added by Inspector: 408 On 4/19/2002 2:40:46 PM inadequately supported bearing walls floor joists overspaned elec and plumb not passed cn left on site with more items on site reveiw with contractor required resubmit new plan with details to comply with correction notice
|
BLD-Framing/Rough-in | 4/15/2002 | 4/15/2002 | 4/15/2002 | P | NR |
Russ Owen
|
|
|
REED ###-####.Needs ele prior to calling for a frame inspection. Also need to check with suppervisor on this it was issued as an addition onto an existing storage shed. Has minimal plans and no foundation ? I left no c/n. 4/16/2002 12:13:48 PM
|
BLD-Framing/Rough-in | 4/11/2002 | 4/12/2002 | 4/12/2002 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 04/11/2002 at 15:22:36. Contact: ###-####.c/n on site 4/12/2002 10:32:22 AM
|