BLD-Final | 8/8/2002 | 8/9/2002 | 8/9/2002 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/08/2002 at 14:40:18. Contact: . C. of C. #23301 issued. 8/9/2002 10:27:52 AM
|
BLD-Final | 8/7/2002 | 8/8/2002 | 8/8/2002 | A | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/07/2002 at 13:36:05. Contact: .C/N--Tempered glass required -- upstairs hallway bath. 8/8/2002 12:27:37 PM
|
BLD-Wall cover | 5/20/2002 | 5/20/2002 | 5/20/2002 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 05/20/2002 at 07:58:05. Contact: .
|
BLD-Framing/Rough-in | 5/14/2002 | 5/14/2002 | 5/14/2002 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 05/14/2002 at 07:18:55. Contact: . Ok to insulate. 5/14/2002 4:17:28 PM
|
BLD-Framing/Rough-in | 5/10/2002 | 5/13/2002 | 5/13/2002 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 05/10/2002 at 14:35:17. Contact: .c/n on site needs seal package befor ok to insulate is given 5/13/2002 9:33:20 AM
|
BLD-Other | 4/30/2002 | 5/1/2002 | 5/1/2002 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 04/30/2002 at 14:18:32. Contact: . SHEAR--Ok to side 5/1/2002 1:30:11 PM
|
BLD-Foundation | 4/8/2002 | 4/8/2002 | 4/8/2002 | P | CANC |
Steven Webb
|
|
|
###-#### CHRIS 4/8/2002 8:38:54 Am-Foundation inspection already done. 4/8/2002 1:37:14 PM
|
BLD-Foundation | 4/8/2002 | 4/8/2002 | 4/8/2002 | A | PART |
Steven Webb
|
|
|
Scheduled by Inspector: 420 On 4/8/2002 8:37:25 AM wip 4/8/2002 8:38:12 AM
|
BLD-Footing | 4/4/2002 | 4/5/2002 | 4/5/2002 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 04/04/2002 at 16:18:27. Contact: ###-####. wip 4/5/2002 10:40:55 AM
|