BLD-Final | 6/13/2002 | 6/14/2002 | 6/14/2002 | P | PASS |
Jim Sly
|
|
|
dave- ###-#### C/C Issued. 6/14/2002 4:06:05 PM
|
BLD-Energy code compliance | 5/3/2002 | 5/6/2002 | 5/6/2002 | A | PASS |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 5/3/2002 | 5/6/2002 | 5/6/2002 | A | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Framing/Rough-in | 5/2/2002 | 5/3/2002 | 5/3/2002 | A | FAIL |
Jim Sly
|
|
|
###-#### dave C/N posted. 5/3/2002 11:30:02 AM
|
BLD-Foundation | 4/12/2002 | 4/15/2002 | 4/15/2002 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 04/12/2002 at 08:52:20. Contact: ###-####.
|
BLD-Footing | 4/12/2002 | 4/12/2002 | 4/12/2002 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 04/12/2002 at 08:51:38. Contact: ###-####.
|