BLD-Final | 11/21/2002 | 11/22/2002 | 11/22/2002 | A | PASS |
Dave Hannah
|
|
|
###-####c.c # 22606 issued 11/22/2002 8:56:05 AM
|
BLD-Final | 11/19/2002 | 11/20/2002 | 11/20/2002 | A | FAIL |
Dave Hannah
|
|
|
ENTRY CODE 401 44 ENTER ###-####needs an elec final 11/20/2002 9:37:37 AM
|
BLD-Energy code compliance | 8/5/2002 | 8/5/2002 | 8/5/2002 | P | PASS |
Steven Webb
|
|
|
###-#### bryan
|
BLD-Framing/Rough-in | 8/1/2002 | 8/2/2002 | 8/2/2002 | P | PART |
Steven Webb
|
|
|
; Phone #: ###-#### C/N posted--ok to insulate. 8/2/2002 3:17:53 PM
|
BLD-Framing/Rough-in | 7/31/2002 | 7/31/2002 | 7/31/2002 | P | FAIL |
Steven Webb
|
|
|
Brian\\###-#### C/N--Several items--Do not insulate--Air seal package not done. 7/31/2002 4:18:17 PM
|
BLD-Framing/Rough-in | 7/23/2002 | 7/24/2002 | 7/24/2002 | A | PASS |
Steven Webb
|
|
|
; Phone #: ###-#### Shear--Ext. ok to side. 7/24/2002 10:34:20 AM
|
BLD-Framing/Rough-in | 7/23/2002 | 7/23/2002 | 7/23/2002 | P | FAIL |
Steven Webb
|
|
|
bryan; Phone #: ###-#### SHEAR--C/N posted--do not side. 7/23/2002 2:39:27 PM
|
BLD-Framing/Rough-in | 5/8/2002 | 5/8/2002 | 5/8/2002 | P | CANC |
Steven Webb
|
|
|
Scheduled by Inspector: 420 On 5/8/2002 12:00:50 PM
|
BLD-Foundation | 4/24/2002 | 4/25/2002 | 4/25/2002 | A | PASS |
Tom Arcoraci
|
|
|
###-#### \\wants to pour between 9:00 and 9:30 he will call. basement walls 4/25/2002 9:45:31 AM
|
BLD-Footing | 4/22/2002 | 4/22/2002 | 4/22/2002 | P | CANC |
Steven Webb
|
|
|
ft jim -###-#### Inspection performed in a.m. 4/22/2002 8:05:26 AM
|
BLD-Footing | 4/22/2002 | 4/22/2002 | 4/22/2002 | A | PART |
Steven Webb
|
|
|
Scheduled by Inspector: 420 On 4/22/2002 8:04:47 AM Footing on basement part only is wip--80 % ready at time of inspection. 4/22/2002 10:39:34 AM
|
BLD-Footing | 4/18/2002 | 4/19/2002 | 4/19/2002 | A | NR |
Steven Webb
|
|
|
###-####
|