BLD-Final | 3/26/2003 | 3/26/2003 | 3/26/2003 | P | PASS |
Carl Dependahl
|
|
|
JAY; Phone #: ###-#### Internet Inspection Request from: Darla Downs...unfin bsmt, structural only, ok per plan. 3/26/2003 4:20:14 PM
|
BLD-Framing/Rough-in | 3/19/2003 | 3/19/2003 | 3/19/2003 | P | PART |
Jim Storey
|
|
|
jay; Phone #: ###-#### Internet Inspection Request from: Annette Moore a 35 at joist conection/ grout all bearing points/ positi 3/19/2003 3:11:10 PM ve conect 3/19/2003 3:11:17 PMion a 3/19/2003 3:11:19 PM wood 3/19/2003 3:11:22 PMo wood post one location. call for hvac final. 3/19/2003 3:11:49 PM
|
BLD-Foundation | 6/20/2002 | 6/21/2002 | 6/21/2002 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 06/20/2002 at 16:50:47. Contact: ###-####. west & front portion of walls ok 6/21/2002 11:32:16 AM
|
BLD-Foundation | 6/17/2002 | 6/18/2002 | 6/18/2002 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 06/17/2002 at 16:40:56. Contact: ###-####. this is a ftg pour sw corner ok part crew still working on ftg 6/18/2002 9:09:58 AM
|
BLD-Wall cover | 6/12/2002 | 6/12/2002 | 6/12/2002 | P | PART |
Tony Young
|
|
|
clyde does not know his phone #
ext walls, allready poured, 340 looked at part 6/12/2002 4:05:16 PM
|
BLD-Foundation | 6/7/2002 | 6/10/2002 | 6/10/2002 | A | PART |
Carl Dependahl
|
|
|
###-####; N-W INT. FDN. WALL ONLY, BAR OK... RECALL FOR EXT WALL PORTIONS WHEN READY 6/10/2002 11:24:34 AM
|
BLD-Foundation | 6/2/2002 | 6/3/2002 | 6/3/2002 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 06/02/2002 at 18:26:56. Contact: ###-####...east portion walls ok to pour. 6/3/2002 11:53:16 AM
|
BLD-Foundation | 5/30/2002 | 5/31/2002 | 5/31/2002 | A | PART |
Russ Owen
|
|
|
found jay- ###-#### . corrected area at earth ok, but are not goning to pour only this section changed mind and now will construct more and pour at same time I told them to call back for another inspection when the rest was complete. 5/31/2002 12:30:01 PM
|
BLD-Foundation | 5/29/2002 | 5/30/2002 | 5/30/2002 | A | FAIL |
Russ Owen
|
|
|
found wall- clyde- ###-####. c/n posted construct as per engineering. 5/30/2002 1:13:31 PM
|
BLD-Framing/Rough-in | 5/30/2002 | 5/30/2002 | 5/30/2002 | P | FAIL |
Carl Dependahl
|
|
|
REBAR ###-#### CLYDE... ADD HORIZ. BAR AT 12"OC PER 8" WALL DETAIL; CLEAN EARTH FROM SIDES TO PROVIDE 8" WALL W/ 3" CLR FOR BAR...RELOCATE FORM BASES (2X4) AT FTGS, RECALL. 5/30/2002 2:42:09 PM
|
BLD-Footing | 5/23/2002 | 5/24/2002 | 5/24/2002 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 05/23/2002 at 17:18:46. Contact: ###-####.
wip 5/24/2002 1:06:24 PM
|
BLD-Conference | 5/21/2002 | 5/22/2002 | 5/22/2002 | A | PART |
Tony Young
|
|
|
for conf jay- ###-####
conf. on soils, ftgs, procedure, etc 5/22/2002 11:06:40 AM
|