Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD02-00752
StatusFinaled
Name SCP GLOBAL TECHNOLOGIES
Site Address 255 N STEELHEAD WAY
Project NameSCP
Customer Number 
ePlanReviewNo
Description
(SCP GLOBAL TECHNOLOGIES/ RACKING) To install storage racks per approved plans and attached engineering within two separte storage areas, one area of 11,968 sq ft and one area of 4,407 sq ft. Work to include, relocation of one 20 minute rated exit door and patching corridor wall,and installation of low rack storage in Warehouse #103 and receiving area #104/ (Warehouse area # 134) Installtion of 340 lf of 20 ft high, 6 ft wide wire shelving, 302 lf 16 ft high pallet racking, 52 lf of 17'8" high carousel storage, 60 lf ft of 16 ft high pallet storage above 6' storage racks, and miscelaneous 6 ft to 8 ft high storage. Note Tis building is fully fire sprinklered any alterations or modifications to the fire sprinkler system shall comply with NFPA #13 as regulated by the fire department. (pc.#214-02) rmh
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection3/22/20063/22/20063/22/2006 CANC
DetailsMike Jordan
DOC - Permit Finaled3/22/20063/22/20063/22/2006APASS
DetailsMike Jordan
BLD-Final5/5/20035/6/20035/6/2003PPASS
DetailsRuss Owen
dean; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. racking ok done complete. 5/6/2003 3:08:45 PM
FIRE-Final Inspection5/2/20035/2/20035/2/2003PPASS
DetailsTroy Cobbley
fire life safety and fire alarm finaled
BLD-Framing/Rough-in8/16/20028/19/20028/19/2002APART
DetailsRuss Owen
###-####
BLD-Framing/Rough-in8/16/20028/19/20028/19/2002APART
DetailsRuss Owen
BLD-Framing/Rough-in8/15/20028/16/20028/16/2002PCANC
DetailsRuss Owen
DEAN; Phone #: ###-####
BLD-Framing/Rough-in8/12/20028/13/20028/13/2002ACANC
DetailsRuss Owen
dean ; Phone #: ###-####
BLD-Framing/Rough-in8/9/20028/12/20028/12/2002APART
DetailsRuss Owen
6310187 8/12/2002 9:17:46 AM
BLD-Framing/Rough-in8/9/20028/9/20028/9/2002PCANC
DetailsRuss Owen
DEAN PLEASE CALL FIRST; Phone #: ###-####
BLD-Framing/Rough-in8/5/20028/5/20028/5/2002PPART
DetailsRuss Owen
dean; Phone #: ###-#### partial bolts. 8/5/2002 3:28:29 PM
BLD-Framing/Rough-in7/24/20027/25/20027/25/2002APART
DetailsRuss Owen
dean; Phone #: ###-####
BLD-Framing/Rough-in7/19/20027/22/20027/22/2002ACANC
DetailsRuss Owen
for racking --dean- ###-####
BLD-Framing/Rough-in7/22/20027/22/20027/22/2002PFAIL
DetailsRuss Owen
center area . 7/22/2002 2:11:03 PM
BLD-Framing/Rough-in7/11/20027/11/20027/11/2002PPART
DetailsRuss Owen
racking -dean -###-####partial on floor pins. 7/11/2002 3:24:37 PM
BLD-Framing/Rough-in7/2/20027/2/20027/2/2002PPART
DetailsRuss Owen
DEAN ###-#### ( RACKING ) portion of racking only marked on plans. 7/2/2002 4:56:58 PM
BLD-Conference5/16/20025/16/20025/16/2002APART
DetailsRuss Owen
Scheduled by Inspector: 407 On 5/16/2002 10:31:53 AM Talked with rack contractor about inspections. 5/16/2002 12:27:27 PM