BLD-Aging Inspection | 2/26/2004 | 2/26/2004 | 2/26/2004 | | DONE |
Dave Hannah
|
|
|
|
BLD-Final | 10/16/2002 | 10/16/2002 | 10/16/2002 | P | PASS |
Carl Dependahl
|
|
|
###-####...rec'd cut-sheet for 1hr lid at stairs, ok for c/o. 10/16/2002 2:10:03 PM
|
FIRE-Final Inspection | 9/3/2002 | 9/3/2002 | 9/3/2002 | P | PASS |
Rick Jackson
|
|
|
gil; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie will have rated door labels and lever hardware on first floor door for structural 9/4/2002 8:26:26 AM
|
BLD-Framing/Rough-in | 8/20/2002 | 8/21/2002 | 8/21/2002 | A | PART |
Jim Storey
|
|
|
CEILING GRID ###-#### GIL stair encloser not per plan need membrane on offce side if rated drop ceilling is to be used all other ceilling ok/ need mech permit resolved in city hall. 8/21/2002 1:49:53 PM
|
BLD-Framing/Rough-in | 7/22/2002 | 7/22/2002 | 7/22/2002 | P | PART |
Carl Dependahl
|
|
|
###-####, kickers added, soffit fireblocked....ok to continue...add firestops at penetrations of rated walls after gyp installed. 7/23/2002 8:13:23 AM
|
BLD-Framing/Rough-in | 7/18/2002 | 7/19/2002 | 7/19/2002 | A | PART |
Carl Dependahl
|
|
|
WALTER; Phone #: ###-####; reception area ok...add fireblocks at ceiling lines at soffits 7/19/2002 3:20:00 PM
|
BLD-Framing/Rough-in | 7/17/2002 | 7/18/2002 | 7/18/2002 | A | PART |
Carl Dependahl
|
|
|
walter; Phone #: ###-#### 2nd fl area ok 7/18/2002 12:32:44 PM
|
BLD-Conference | 6/27/2002 | 6/28/2002 | 6/28/2002 | A | PASS |
Carl Dependahl
|
|
|
WALTER ###-####: re 1 hr stair enclosure; ok to use standard 1hr assy...extend gyp to floor deck. 6/28/2002 2:14:05 PM
|