BLD-Conference | 8/13/2003 | 8/13/2003 | 8/13/2003 | P | PASS |
Carl Dependahl
|
|
|
see history 8/13/2003 1:20:48 PM
|
Permanent Occupancy | | 8/13/2003 | 8/13/2003 | | DONE |
|
|
|
|
BLD-Aging Inspection | 8/12/2003 | 8/12/2003 | 8/12/2003 | | PASS |
Carl Dependahl
|
|
|
shows finalled 8/12/2003 1:20:50 PM
|
BLD-Conference | 1/2/2003 | 1/2/2003 | 1/2/2003 | A | PASS |
Carl Dependahl
|
|
|
referred to Cathy, final appears ok per record... 1/2/2003 3:09:52 PM
|
BLD-Final | 6/20/2002 | 6/21/2002 | 6/21/2002 | P | PASS |
Tom Arcoraci
|
|
|
###-#### mark OK FOR PERM OCC 6/21/2002 3:03:48 PM
|
BLD-Final | 6/19/2002 | 6/20/2002 | 6/20/2002 | A | NR |
Dave Hannah
|
|
|
MARK ###-#### needs fire life safty and zoning sign off 6/20/2002 9:33:42 AM
|
FIRE-Final Inspection | 6/20/2002 | 6/20/2002 | 6/20/2002 | P | PASS |
Rick Jackson
|
|
|
MARK ###-#### will have "Door to remain..." sign above main entrance; keyed lock at main door and fire extinguisher for structural 6/20/2002 10:53:52 AM
|
BLD-Framing/Rough-in | 5/13/2002 | 5/14/2002 | 5/14/2002 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 05/13/2002 at 07:51:02. Contact: ###-####. needs resubmital for change in floor plan 5/14/2002 10:59:30 AM
|
BLD-Conference | 5/9/2002 | 5/10/2002 | 5/10/2002 | A | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 05/09/2002 at 17:35:41. Contact: ###-####.
|