BLD-Energy code compliance | 5/29/2002 | 5/30/2002 | 5/30/2002 | A | CANC |
Tony Young
|
|
|
MIKE ###-####
|
BLD-Energy code compliance | 5/30/2002 | 5/30/2002 | 5/30/2002 | P | PASS |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 5/28/2002 | 5/29/2002 | 5/29/2002 | A | PART |
Jim Storey
|
|
|
###-#### ok to insulate need lateral brace on trusses noted on truss engineering to be checked at engery insp. 5/29/2002 2:06:44 PM
|
BLD-Framing/Rough-in | 5/8/2002 | 5/9/2002 | 5/9/2002 | A | FAIL |
Jim Storey
|
|
|
1. (Approved drawings) Approved plans and specifications shall not be changed, modified or altered without authorizations from the building official. All work regulated by the 1997 UBC shall be done in accordance with the approved plans. (1997 UBC 106.4.1) This plan review report is part of the approved drawings. The work shall comply with all applicable items listed in this report.NORTH EAST HOLD DOWNS AND BRACE PANELS NOT AS PER PLAN RESUBMIT TO PLAN REVIEW FOR APPROVAL.
2. (Approved drawings) Approved plans and specifications shall not be changed, modified or altered without authorizations from the building official. All work regulated by the 1997 UBC shall be done in accordance with the approved plans. (1997 UBC 106.4.1) This plan review report is part of the approved drawings. The work shall comply with all applicable items listed in this report.
|
BLD-Grading Inspection | 4/16/2002 | 4/16/2002 | 4/16/2002 | | DONE |
Rita DeYoung
|
|
|
Footing subgrade has been approved by the geotechnical engineer.
|
BLD-Footing | 4/12/2002 | 4/12/2002 | 4/12/2002 | P | PART |
Tony Young
|
|
|
###-#### CLAY
ok pending soils report 4/12/2002 3:43:30 PM
|