Permit Information
Permit NumberBLD02-00841
StatusExpired
Name ROMAN CATHOLIC DIOCE SE
Site Address 807 N 8TH ST
Project NameST JOHNS CATHEDRAL
Customer Number 
ePlanReviewNo
Description
(ST. JOHN'S CATHEDRAL)(CHOIR LOFT EXIT) Exterior work to include construction of a steel exterior stair on north side of building for a second exit from the choir loft; interior work to include 1-hr. enclosure accessing new stair and 1-hr. enclosure of existing exit through choir work room. All work per approved plans and CZC02-00048.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection2/26/20042/26/20042/26/2004 DONE
DetailsDave Hannah
BLD-Conference12/24/20021/3/20031/6/2003PPASS
DetailsCarl Dependahl
verified othet finals...ok for final. 1/6/2003 10:16:39 AM
BLD-Final12/24/200212/24/200212/24/2002PPASS
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/24/2002 at 07:52:57. Contact: ###-####.struct ok...no card onsite 12/24/2002 1:51:12 PM
BLD-Final12/20/200212/23/200212/23/2002ACANC
DetailsSteven Webb
DAVE; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Cancelled by contractor--requesting Carl--will recall. 12/23/2002 10:26:56 AM
BLD-Final11/26/200211/27/200211/27/2002AFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 11/26/2002 at 10:03:15. Contact: ###-####...complete hdwe install at ext stair, need weld insp reports, extend lower landing & rail extension (12"min.), no insp inside...need plans 11/27/2002 9:17:00 AM
FIRE-Final Inspection11/26/200211/26/200211/26/2002PPASS
DetailsTroy Cobbley
Life safety finaled. The contractor has not installed the door at the bottom of the stairs yet and will need to have the hardware verified by the structural inspector 11/26/2002 3:24:08 PM
BLD-Conference10/9/200210/10/200210/10/2002APASS
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 10/09/2002 at 16:04:57. Contact: ###-####....need stair resub... 10/10/02 12:20:44 PM
BLD-Wall cover9/3/20029/3/20029/3/2002APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 09/03/2002 at 07:18:25. Contact: ###-####...partial, tunnel type stair enclosure at south side, upper floor ok to begin cover, need spec. insp reports for fabbbed steel stairs at ext. 9/3/2002 3:53:35 PM
BLD-Footing7/22/20027/23/20027/23/2002APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/22/2002 at 15:04:37. Contact: ###-####. cassion rebar spacing ok need to instal 3 inch dobies to cages for side spacing. 7/23/2002 9:49:03 AM