BLD-Final | 9/3/2002 | 9/3/2002 | 9/3/2002 | P | PASS |
Alan Hauser
|
|
|
c/c #21675 9/4/2002 1:21:17 PM
|
BLD-Final | 8/30/2002 | 8/30/2002 | 8/30/2002 | P | FAIL |
Russ Owen
|
|
|
TERRY ; Phone #: ###-#### Internet Inspection Request from: Annette Moore LOCK BOX 193c/n posted. 8/30/2002 3:52:02 PM
|
BLD-Energy code compliance | 7/8/2002 | 7/8/2002 | 7/8/2002 | P | PASS |
Dave Hannah
|
|
|
###-#### terry all c/n items completed ok to cover 7/8/2002 4:28:42 PM
|
BLD-Framing/Rough-in | 7/1/2002 | 7/3/2002 | 7/3/2002 | A | FAIL |
Russ Owen
|
|
|
###-####needs new truss details.no inspection done. c/n on site. 7/3/2002 1:59:12 PM
|
BLD-Framing/Rough-in | 7/3/2002 | 7/3/2002 | 7/3/2002 | P | FAIL |
Dave Hannah
|
|
|
TERRY- ###-#### FR INSP c/n on site ok to insulate 7/3/2002 1:07:53 PM
|
BLD-Framing/Rough-in | 6/19/2002 | 6/20/2002 | 6/20/2002 | A | PART |
Steven Webb
|
|
|
TERRY ###-#### SHEER NAIL--Ok to cover 6/20/2002 11:39:50 AM
|
BLD-Framing/Rough-in | 6/13/2002 | 6/14/2002 | 6/14/2002 | A | NR |
Carl Dependahl
|
|
|
SHEER NAIL ###-#### TERRY complete hd's 6/14/2002 4:53:25 PM
|
BLD-Framing/Rough-in | 6/14/2002 | 6/14/2002 | 6/14/2002 | P | PART |
Tom Arcoraci
|
|
|
shear needs phd 8s intalled on 2 studs at garage front and 8 ds on panel 6/14/2002 2:35:00 PM
|
BLD-Framing/Rough-in | 5/9/2002 | 5/9/2002 | 5/9/2002 | P | PART |
Steven Webb
|
|
|
###-#### rob stem wall FOUNDATION NOT FRAMING--wip 80% ready at time of inspection. 5/9/2002 4:12:49 PM
|
BLD-Footing | 5/8/2002 | 5/8/2002 | 5/8/2002 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 05/08/2002 at 07:10:17. Contact: ###-####. wip 85% ready at time of inspection. 5/8/2002 3:23:30 PM
|