BLD-Final | 8/16/2002 | 8/16/2002 | 8/16/2002 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/16/2002 at 09:15:26. Contact: ###-####. C/C issued. 8/16/2002 1:40:55 PM
|
BLD-Final | 8/14/2002 | 8/15/2002 | 8/15/2002 | A | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/14/2002 at 16:03:48. Contact: ###-####. C/N on site. 8/15/2002 9:59:24 AM
|
BLD-Framing/Rough-in | 6/26/2002 | 6/26/2002 | 6/26/2002 | P | PASS |
Steven Webb
|
|
|
###-#### late pm--Garage wall shear in place--ok to cover. 6/26/2002 4:45:38 PM
|
BLD-Energy code compliance | 6/24/2002 | 6/25/2002 | 6/25/2002 | A | PART |
Russ Owen
|
|
|
terry- ###-#### energy Insulation ok but left a c/n for 2 hold downs on garage fire wall with no osb ? called contractor he will check approved plans. 6/25/2002 3:12:38 PM
|
BLD-Framing/Rough-in | 6/19/2002 | 6/20/2002 | 6/20/2002 | A | PASS |
Steven Webb
|
|
|
TERRY ###-#### Corrections completed--Ok to insulate. 6/20/2002 8:39:36 AM
|
BLD-Framing/Rough-in | 6/18/2002 | 6/18/2002 | 6/18/2002 | P | PART |
Steven Webb
|
|
|
###-#### terry C/N Ok to insulate. 6/18/2002 2:51:24 PM
|
BLD-Framing/Rough-in | 6/6/2002 | 6/6/2002 | 6/6/2002 | P | PART |
Steven Webb
|
|
|
SHEER NAIL TERRY ###-#### Retrofitted hd and engineering from prior c/n completed-ok to side entire house. 6/6/2002 1:38:24 PM
|
BLD-Framing/Rough-in | 5/30/2002 | 5/31/2002 | 5/31/2002 | A | PART |
Dave Hannah
|
|
|
fr insp-- terry- ###-#### c/n on site hold downs missing or under windows and one panel on front changed areas marked on plans ok to cover all but areas in ? 5/31/2002 10:57:28 AM
|
BLD-Foundation | 5/9/2002 | 5/10/2002 | 5/10/2002 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 05/09/2002 at 07:16:24. Contact: ###-####. wip--75% ready at time of inspection. 5/10/2002 2:50:45 PM
|
BLD-Footing | 5/9/2002 | 5/9/2002 | 5/9/2002 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 05/09/2002 at 07:15:38. Contact: ###-####.
|
BLD-Foundation | 5/8/2002 | 5/9/2002 | 5/9/2002 | A | CANC |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 05/08/2002 at 06:44:33. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 05/09/2002 at 07:14:30.
|
BLD-Footing | 5/8/2002 | 5/8/2002 | 5/8/2002 | A | NR |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 05/08/2002 at 06:43:51. Contact: ###-####. No forms only the excavation. 5/8/2002 8:50:28 AM
|