Permit Information
Permit NumberBLD02-00912
StatusFinaled
Name PRESTIGE HOMES INC
Site Address 3898 E IMMIGRANT PASS CT
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 2017 sq. ft. one story single family dwelling with a 710 sq. ft. attached three car garage, a 100 sq. ft. covered entry way and a 165 sq. ft. partially covered concrete patio at rear of structure per approved plans, all engineering and attached requirement lists. PC #221 SOLAR PROTECTED DJO
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/16/20028/16/20028/16/2002PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 08/16/2002 at 09:15:26. Contact: ###-####. C/C issued. 8/16/2002 1:40:55 PM
BLD-Final8/14/20028/15/20028/15/2002AFAIL
DetailsSteven Webb
Scheduled by a contractor via Hello! on 08/14/2002 at 16:03:48. Contact: ###-####. C/N on site. 8/15/2002 9:59:24 AM
BLD-Framing/Rough-in6/26/20026/26/20026/26/2002PPASS
DetailsSteven Webb
###-#### late pm--Garage wall shear in place--ok to cover. 6/26/2002 4:45:38 PM
BLD-Energy code compliance6/24/20026/25/20026/25/2002APART
DetailsRuss Owen
terry- ###-#### energy Insulation ok but left a c/n for 2 hold downs on garage fire wall with no osb ? called contractor he will check approved plans. 6/25/2002 3:12:38 PM
BLD-Framing/Rough-in6/19/20026/20/20026/20/2002APASS
DetailsSteven Webb
TERRY ###-#### Corrections completed--Ok to insulate. 6/20/2002 8:39:36 AM
BLD-Framing/Rough-in6/18/20026/18/20026/18/2002PPART
DetailsSteven Webb
###-#### terry C/N Ok to insulate. 6/18/2002 2:51:24 PM
BLD-Framing/Rough-in6/6/20026/6/20026/6/2002PPART
DetailsSteven Webb
SHEER NAIL TERRY ###-#### Retrofitted hd and engineering from prior c/n completed-ok to side entire house. 6/6/2002 1:38:24 PM
BLD-Framing/Rough-in5/30/20025/31/20025/31/2002APART
DetailsDave Hannah
fr insp-- terry- ###-#### c/n on site hold downs missing or under windows and one panel on front changed areas marked on plans ok to cover all but areas in ? 5/31/2002 10:57:28 AM
BLD-Foundation5/9/20025/10/20025/10/2002PPART
DetailsSteven Webb
Scheduled by a contractor via Hello! on 05/09/2002 at 07:16:24. Contact: ###-####. wip--75% ready at time of inspection. 5/10/2002 2:50:45 PM
BLD-Footing5/9/20025/9/20025/9/2002APASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 05/09/2002 at 07:15:38. Contact: ###-####.
BLD-Foundation5/8/20025/9/20025/9/2002ACANC
DetailsSteven Webb
Scheduled by a contractor via Hello! on 05/08/2002 at 06:44:33. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 05/09/2002 at 07:14:30.
BLD-Footing5/8/20025/8/20025/8/2002ANR
DetailsSteven Webb
Scheduled by a contractor via Hello! on 05/08/2002 at 06:43:51. Contact: ###-####. No forms only the excavation. 5/8/2002 8:50:28 AM