BLD-Final | 8/20/2002 | 8/20/2002 | 8/20/2002 | P | PASS |
Jim Sly
|
|
|
###-#### C/C issued. 8/20/2002 1:51:35 PM
|
BLD-Energy code compliance | 5/22/2002 | 5/23/2002 | 5/23/2002 | A | PASS |
Jim Sly
|
|
|
pj ###-####-energy code
|
BLD-Framing/Rough-in | 5/22/2002 | 5/23/2002 | 5/23/2002 | A | PASS |
Jim Sly
|
|
|
pj - ###-####
|
BLD-Framing/Rough-in | 5/21/2002 | 5/21/2002 | 5/21/2002 | P | FAIL |
Jim Sly
|
|
|
P J ###-#### C/N on site 5/21/2002 3:30:11 PM
|
BLD-Framing/Rough-in | 5/13/2002 | 5/14/2002 | 5/14/2002 | A | PART |
Jim Sly
|
|
|
SHEER WALL PJ ###-#### Shear nailing OK..... Add retro fit HD to South end ....far North shear panel Gar front. 5/14/2002 12:55:12 PM
|
BLD-Foundation | 5/3/2002 | 5/3/2002 | 5/3/2002 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/03/2002 at 06:07:36. Contact: ###-####.
|
BLD-Footing | 5/2/2002 | 5/2/2002 | 5/2/2002 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/02/2002 at 08:58:17. Contact: ###-####.
|