BLD-Final | 8/2/2002 | 8/5/2002 | 8/5/2002 | P | PASS |
Tom Arcoraci
|
|
|
stan; Phone #: ###-#### ok for perm occ 8/5/2002 4:51:36 PM
|
FIRE-Final Inspection | 8/2/2002 | 8/5/2002 | 8/5/2002 | P | PASS |
Troy Cobbley
|
|
|
fire life/safety finaled 8/5/2002 1:14:42 PM
|
Permanent Occupancy | | 8/5/2002 | 8/5/2002 | | DONE |
|
|
|
|
BLD-Final | 7/30/2002 | 8/1/2002 | 8/1/2002 | P | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 07/30/2002 at 07:10:27. Contact: ###-####.needs all sigs on card
8/1/2002 1:14:57 PM
|
FIRE-Final Inspection | 7/31/2002 | 7/31/2002 | 7/31/2002 | P | NR |
Troy Cobbley
|
|
|
I did a conference with Steve ###-#### at the job site. Notified him that the manual flush bolts will need to be removed from the interior doors and that approved hardware will be provided on the exterior doors. Automatic shut down for the HVAC units needs to be verified for the year in which the building was built. One more fire extinguisher is required. 8/1/2002 9:47:16 AM
|
BLD-Framing/Rough-in | 7/9/2002 | 7/9/2002 | 7/9/2002 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 07/09/2002 at 09:43:07. Contact: ###-####. walls ok to cover 7/10/2002 8:23:01 AM
|