BLD-Other | 7/29/2002 | 7/29/2002 | 7/29/2002 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 07/29/2002 at 11:20:40. Contact: ###-####. Final OK 7/29/2002 2:08:13 PM
|
BLD-Framing/Rough-in | 5/10/2002 | 5/13/2002 | 5/13/2002 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/10/2002 at 13:14:42. Contact: . Frame OK.....C/N for No footing directly under load at slab. Need to verify B 4 final. 5/13/2002 12:01:31 PM
|