BLD-Conference | 8/7/2002 | 8/8/2002 | 8/8/2002 | A | DONE |
Steven Webb
|
|
|
|
BLD-Final | 8/7/2002 | 8/8/2002 | 8/8/2002 | A | PASS |
Steven Webb
|
|
|
###-#### GARY C. of C. #23298 issued. 8/8/2002 8:57:04 AM
|
BLD-Conference | 8/7/2002 | 8/7/2002 | 8/7/2002 | P | PASS |
Carl Dependahl
|
|
|
rec'd possible complaint thru perry about adjacent lot...slab /fnd cracks.
|
BLD-Final | 8/6/2002 | 8/7/2002 | 8/7/2002 | A | CANC |
Jim Storey
|
|
|
gary; Phone #: ###-#### out of time to do insp. 8/7/2002 10:25:07 AM
|
BLD-Final | 8/7/2002 | 8/7/2002 | 8/7/2002 | P | FAIL |
Steven Webb
|
|
|
C/N--Tempered glass needed in master bath. 8/7/2002 2:21:01 PM
|
BLD-Energy code compliance | 6/13/2002 | 6/14/2002 | 6/14/2002 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 06/13/2002 at 13:00:35. Contact: ###-####.
|
BLD-Framing/Rough-in | 6/13/2002 | 6/14/2002 | 6/14/2002 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 06/13/2002 at 13:02:26. Contact: ###-####. c/n made ok 6/14/2002 9:53:58 AM
|
BLD-Energy code compliance | 6/11/2002 | 6/12/2002 | 6/12/2002 | P | PART |
Tony Young
|
|
|
DENNIS ###-####
seal ok 6/12/2002 3:53:41 PM
|
BLD-Framing/Rough-in | 6/11/2002 | 6/12/2002 | 6/12/2002 | P | FAIL |
Tony Young
|
|
|
DENNIS ###-####
c/n posted, need to see int. o. s. b. shear after insulation, ok to insulate 6/12/2002 3:54:37 PM
|
BLD-Framing/Rough-in | 6/10/2002 | 6/11/2002 | 6/11/2002 | A | NR |
Steven Webb
|
|
|
###-#### dennis fr Needs mechanical r. i inspection. 6/11/2002 9:28:40 AM
|
BLD-Framing/Rough-in | 6/3/2002 | 6/4/2002 | 6/4/2002 | A | FAIL |
Steven Webb
|
|
|
sheer ###-#### gary C/N issued 6/4/2002 9:05:18 AM
|
BLD-Framing/Rough-in | 6/4/2002 | 6/4/2002 | 6/4/2002 | P | PART |
Steven Webb
|
|
|
shear gary- ###-#### 6/4/2002 3:09:04 PM Ok to side. 6/4/2002 3:09:14 PM
|
BLD-Foundation | 5/8/2002 | 5/8/2002 | 5/8/2002 | P | CANC |
Steven Webb
|
|
|
###-#### Did inspection in a.m. 5/8/2002 8:58:27 AM
|
BLD-Foundation | 5/8/2002 | 5/8/2002 | 5/8/2002 | A | PART |
Steven Webb
|
|
|
Scheduled by Inspector: 420 On 5/8/2002 8:57:45 AM wip 5/8/2002 11:29:15 AM
|
BLD-Footing | 5/7/2002 | 5/7/2002 | 5/7/2002 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 05/07/2002 at 07:17:19. Contact: ###-####. wip 5/7/2002 10:34:45 AM
|