FIRE-Final Inspection | 8/28/2002 | 8/29/2002 | 8/29/2002 | P | PASS |
Troy Cobbley
|
|
|
finaled 8/29/2002 4:22:16 PM
|
Permanent Occupancy | | 8/29/2002 | 8/29/2002 | | DONE |
|
|
|
|
BLD-Final | 8/27/2002 | 8/28/2002 | 8/28/2002 | P | PART |
Tom Arcoraci
|
|
|
###-#### JC ok for perm when fire signs perm 8/28/2002 3:25:54 PM
|
FIRE-Final Inspection | 8/27/2002 | 8/28/2002 | 8/28/2002 | A | FAIL |
Troy Cobbley
|
|
|
provide fire extinguisher, lock on the restroom door locks people in so it needs changed, door hardware on storage room needs to be changed to approved type, provide approved plans on site so I can finish the inspection 8/28/2002 10:55:24 AM
|
BLD-Framing/Rough-in | 5/8/2002 | 5/9/2002 | 5/9/2002 | P | PASS |
Jim Sly
|
|
|
###-#### gary call first
|