BLD-Final | 6/11/2002 | 6/11/2002 | 6/11/2002 | P | PASS |
Jim Sly
|
|
|
###-#### C/C issued. 6/11/2002 3:50:55 PM
|
BLD-Framing/Rough-in | 5/23/2002 | 5/23/2002 | 5/23/2002 | P | PASS |
Dave Hannah
|
|
|
Scheduled by Inspector: 425 On 5/23/2002 11:30:48 AM fix on roof over hang 5/23/2002 3:41:51 PM
|
BLD-Framing/Rough-in | 5/21/2002 | 5/22/2002 | 5/22/2002 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 05/21/2002 at 21:41:49. Contact: ###-####.
|
BLD-Framing/Rough-in | 5/22/2002 | 5/22/2002 | 5/22/2002 | P | CANC |
Dave Hannah
|
|
|
Scheduled by Inspector: 425 On 5/22/2002 9:04:05 AM
|
BLD-Energy code compliance | 5/17/2002 | 5/17/2002 | 5/17/2002 | A | PASS |
Dave Hannah
|
|
|
Added by Inspector: 425 On 5/17/2002 11:49:42 AM
|
BLD-Framing/Rough-in | 5/16/2002 | 5/17/2002 | 5/17/2002 | A | PASS |
Dave Hannah
|
|
|
john ###-#### fr
|
BLD-Framing/Rough-in | 5/15/2002 | 5/16/2002 | 5/16/2002 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 05/15/2002 at 16:34:07. Contact: ###-####.C/N posted . Noted the roof over hand is approx 6 in from the property line , I told him to verify with pvand z should only be about 1.5 foot from line. 5/16/2002 4:57:46 PM
|
BLD-Footing | 5/7/2002 | 5/7/2002 | 5/7/2002 | P | PASS |
Dave Hannah
|
|
|
###-#### RANDY
|
BLD-Footing | 5/3/2002 | 5/3/2002 | 5/3/2002 | P | PART |
Jim Sly
|
|
|
###-#### DAX
|