BLD-Final | 12/9/2002 | 12/10/2002 | 12/10/2002 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/09/2002 at 15:20:15. Contact: ###-####.
|
BLD-Framing/Rough-in | 6/3/2002 | 6/4/2002 | 6/4/2002 | A | PASS |
Jim Storey
|
|
|
DEAN ###-#### ok to cover all but gas test on fire place / 6/4/2002 11:11:26 AM
|
BLD-Framing/Rough-in | 5/31/2002 | 6/3/2002 | 6/3/2002 | P | PART |
Steven Webb
|
|
|
###-#### C/N posted--Needs mech. r.in as well as fireplace r.i prior to granting ok to cover. 6/3/2002 1:22:53 PM
|
BLD-Framing/Rough-in | 5/31/2002 | 5/31/2002 | 5/31/2002 | A | PART |
Jim Storey
|
|
|
blk and nail rafters per plan/ ok to insulate/ need fire place insp.
|
BLD-Framing/Rough-in | 5/30/2002 | 5/30/2002 | 5/30/2002 | P | FAIL |
Jim Storey
|
|
|
1. BRACED WALL PANELS - Braced wall lines shall consist of braced wall panels which are in line or offset from each other by not more than 4 feet. Braced wall panels shall start at not more than 8 feet from each end of a braced wall line. All braced wall panels shall be clearly indicated on the plans. (1997 UBC 2320.11.3) Braced wall lines are considered to end at perpendicular braced wall lines. Braced wall panels shall meet the requirements for location, type, and amount of bracing specified in 1997 UBC Table 23-IV-C-1. The construction of braced wall panels shall be by one of the methods listed in 1997 UBC 2320.11.3. Diagonal braces are not allowed in Seismic Zone "2B". (1997 UBC Table 23-IV-C-1) windows sized to only a 50 ft wall length and pop out cantalever not per plan needs planreviewers approval.
|
BLD-Framing/Rough-in | 5/1/2002 | 5/2/2002 | 5/2/2002 | A | PASS |
Jim Storey
|
|
|
stem wall ###-#### ed stem wall rebar ok###-#### ed 5/2/2002 11:05:01 AM
|
BLD-Footing | 4/30/2002 | 5/1/2002 | 5/1/2002 | A | PASS |
Jim Storey
|
|
|
###-#### ft ok rebar ok/ interior pad ft ok 5/1/2002 10:39:10 AM
|