BLD-Final | 7/7/2003 | 7/8/2003 | 7/8/2003 | A | NR |
Dave Hannah
|
|
|
ROB; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Final | 7/8/2003 | 7/8/2003 | 7/8/2003 | P | PASS |
Dave Hannah
|
|
|
robert; Phone #: ###-#### Internet Inspection Request from: Barbara Moore c.c # 23961 issued 7/8/2003 1:54:21 PM
|
BLD-Grading Inspection | 7/7/2003 | 7/7/2003 | 7/7/2003 | | PASS |
Rita DeYoung
|
|
|
Final grading and drainage is complete and approved.
|
BLD-Framing/Rough-in | 4/17/2003 | 4/18/2003 | 4/18/2003 | A | PART |
Dave Hannah
|
|
|
rob; Phone #: ###-#### Internet Inspection Request from: Annette Moore ok to cover all but for around fire place 4/18/2003 4:33:11 PM
|
BLD-Framing/Rough-in | 4/15/2003 | 4/15/2003 | 4/15/2003 | P | PART |
Dave Hannah
|
|
|
to check hold downs rob; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie hold downs ok but still need to fasten to studs 4/15/2003 4:46:12 PM
|
BLD-Conference | 4/3/2003 | 4/3/2003 | 4/3/2003 | P | PASS |
Dave Hannah
|
|
|
ROB; Phone #: ###-#### Internet Inspection Request from: Darla Downs all c/n items completed but for enter shear walls and hold downs ok to start sheetrock all but for this area contracter is grtting engineering 4/3/2003 2:26:53 PM
|
BLD-Conference | 4/1/2003 | 4/2/2003 | 4/2/2003 | A | DONE |
Dave Hannah
|
|
|
rob; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Framing/Rough-in | 2/27/2003 | 2/28/2003 | 2/28/2003 | A | FAIL |
Dave Hannah
|
|
|
###-#### rob c/n on site ok to insulate 2/28/2003 11:15:48 AM
|
BLD-Framing/Rough-in | 2/12/2003 | 2/14/2003 | 2/14/2003 | A | FAIL |
Dave Hannah
|
|
|
###-#### needs mec permits on hvac and fire place along with r/i inspections 2/14/2003 10:35:12 AM
|
BLD-Framing/Rough-in | 2/4/2003 | 2/4/2003 | 2/4/2003 | P | PART |
Dave Hannah
|
|
|
shear- rob; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok to cover ext c/n items completed 2/4/2003 4:29:22 PM
|
BLD-Framing/Rough-in | 1/3/2003 | 1/6/2003 | 1/6/2003 | A | FAIL |
Dave Hannah
|
|
|
PLANS IN F/P ROB- ###-####--SHEAR c/n on site 1/6/2003 10:09:28 AM
|
BLD-Foundation | 9/13/2002 | 9/13/2002 | 9/13/2002 | P | PASS |
Tom Arcoraci
|
|
|
jerry ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie wip ok hds not in place 9/13/2002 1:40:52 PM
|
BLD-Grading Inspection | 9/10/2002 | 9/10/2002 | 9/10/2002 | | PASS |
Rita DeYoung
|
|
|
Geotechnical engineer has approved the footing subgrade.
|
BLD-Footing | 9/9/2002 | 9/9/2002 | 9/9/2002 | P | NR |
Tom Arcoraci
|
|
|
jerry ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie wip ok needs ok from terry records 9/9/2002 3:45:29 PM
|