BLD-Final | 9/26/2002 | 9/26/2002 | 9/26/2002 | P | PASS |
Dave Hannah
|
|
|
###-#### lock box 193 c.c # 22595 issued 9/26/2002 3:54:18 PM
|
BLD-Energy code compliance | 7/29/2002 | 7/29/2002 | 7/29/2002 | P | PASS |
Steven Webb
|
|
|
###-#### terry Ok to cover 7/29/2002 3:55:20 PM
|
BLD-Framing/Rough-in | 7/25/2002 | 7/25/2002 | 7/25/2002 | P | PASS |
Steven Webb
|
|
|
TERRY; Phone #: ###-#### Corrections made--ok to insulate. 7/25/2002 3:16:51 PM
|
BLD-Framing/Rough-in | 7/22/2002 | 7/23/2002 | 7/23/2002 | A | PART |
Steven Webb
|
|
|
###-#### C/N--Ok to insulate 7/23/2002 11:20:33 AM
|
BLD-Framing/Rough-in | 7/11/2002 | 7/11/2002 | 7/11/2002 | P | PART |
Steven Webb
|
|
|
terry- ###-####--shear nail Eng. received and constructed per eng. on bay from prior c/n--Ok to side. 7/11/2002 4:06:40 PM
|
BLD-Framing/Rough-in | 7/1/2002 | 7/3/2002 | 7/3/2002 | A | FAIL |
Russ Owen
|
|
|
###-####The front bay is not completed as er enginnering c/n posted. 7/3/2002 1:59:59 PM
|
BLD-Foundation | 6/6/2002 | 6/7/2002 | 6/7/2002 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 06/06/2002 at 07:01:01. Contact: ###-####. Footing not foundation--wip 6/7/2002 9:43:35 AM
|
BLD-Footing | 6/6/2002 | 6/6/2002 | 6/6/2002 | P | CANC |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 06/06/2002 at 07:00:33. Contact: ###-####.
|