Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD02-01054
StatusFinaled
Name LIMBER DAVID & BARBARA
Site Address 4146 N JONES AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
To excavate under and place basement walls under an existing 3-bedroom 2-story single family dwelling. There is to be a bedroom; family room, with wet bar a storage room, bathroom , and windows to meet egrewss and natural light requirements. The new basement is to be heated using an in floor radiant heat system to be done with a mechanical permit. All per the approved plans as marked and attached notes and engineering. Seperate elec, plmg, and mechanical permits are required. R-1C per aht pep
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/10/200310/10/200310/10/2003PPASS
DetailsJim Sly
DAVE; Phone #: ###-#### Internet Inspection Request from: Annette Moore C/C issued. 10/10/2003 12:52:06 PM
BLD-Conference9/15/20039/16/20039/16/2003APASS
DetailsTom Arcoraci
###-#### david ok for guard rail to match old rail 9/16/2003 8:55:56 AM
BLD-Conference9/11/20039/11/20039/11/2003PPART
DetailsJim Sly
###-#### david Belmont park R linstock. 9/11/2003 1:51:02 PM
BLD-Framing/Rough-in10/15/200210/16/200210/16/2002PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/15/2002 at 16:41:59. Contact: ###-####.stairs are ok to cover 10/16/2002 1:50:49 PM
BLD-Framing/Rough-in10/14/200210/15/200210/15/2002ACANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/14/2002 at 19:03:48. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 10/15/2002 at 06:54:23.
BLD-Energy code compliance10/11/200210/14/200210/14/2002APASS
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung ok to cover basement area but still need to look at finish framing fix for stairs going to second floor 10/14/2002 11:16:24 AM
BLD-Framing/Rough-in10/8/200210/9/200210/9/2002PFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/08/2002 at 13:00:53. Contact: ###-####.ok to insulate basement but needs to support outside edge of stairs going to second floor 10/9/2002 4:20:31 PM
BLD-Framing/Rough-in10/6/200210/7/200210/7/2002PCANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/06/2002 at 08:25:29. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 10/07/2002 at 06:48:09.
BLD-Conference8/19/20028/20/20028/20/2002ADONE
DetailsDave Hannah
DAVE; Phone #: ###-####
BLD-Foundation6/18/20026/18/20026/18/2002PPASS
DetailsDave Hannah
found wall- dave- ###-#### or ###-#### this finishes this part of the permit they will start framing the basement need to check floor joist at framing 6/19/2002 7:25:37 AM
BLD-Foundation5/23/20025/24/20025/24/2002APART
DetailsRuss Owen
TONY ###-####
BLD-Foundation5/23/20025/24/20025/24/2002PCANC
DetailsJim Sly
TONY ###-####
BLD-Foundation5/21/20025/22/20025/22/2002APART
DetailsDave Hannah
tony ###-#### -basement walls first section of walls 5/22/2002 9:04:49 AM