BLD-Final | 10/31/2003 | 10/31/2003 | 10/31/2003 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/31/2003 at 7:05:17 AM. Contact: ###-####. 10/31/2003 11:22:54 AM OK for Perm occ. 10/31/2003 11:32:57 AM
|
FIRE-Final Inspection | 10/29/2003 | 10/29/2003 | 10/29/2003 | P | PASS |
Troy Cobbley
|
|
|
fire life safety finaled 10/29/2003 3:48:31 PM
|
Code Occupancy Approval | | | 10/3/2003 | | PASS |
|
|
|
Compliance met.
|
BLD-Other | 8/28/2003 | 8/28/2003 | 8/28/2003 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/28/2003 at 10:57:37 AM. Contact: ###-####. Insp of area separation wall thru soffit....OK 8/28/2003 12:35:10 PM
|
BLD-Wall cover | 8/19/2003 | 8/20/2003 | 8/20/2003 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 8/19/2003 at 6:46:51 PM. Contact: ###-####.ok to drywall. 8/26/2003 10:02:05 AM
|
BLD-Conference | 8/19/2003 | 8/19/2003 | 8/19/2003 | P | PASS |
Russ Owen
|
|
|
ok to drywall both sides. 8/19/2003 4:34:04 PM
|
BLD-Framing/Rough-in | 8/6/2003 | 8/7/2003 | 8/7/2003 | P | PART |
Russ Owen
|
|
|
vincent; Phone #: ###-#### Internet Inspection Request from: Barbara Mooreneeds addnl work 8/12/2003 10:18:58 AM
|
BLD-Wall cover | 6/24/2003 | 6/25/2003 | 6/25/2003 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 6/24/2003 at 5:59:12 PM. Contact: ###-####. waiting to see about changes on re-submittals. 6/25/2003 5:16:55 PM
|
BLD-Framing/Rough-in | 6/2/2003 | 6/3/2003 | 6/3/2003 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 6/2/2003 at 5:44:34 PM. Contact: ###-####.still need some items addressed by architect, also was informed this day that gypcrete will not be used at floor.POSTED C/N. 6/5/2003 10:19:13 AM
|
BLD-Framing/Rough-in | 5/29/2003 | 5/29/2003 | 5/29/2003 | P | FAIL |
Russ Owen
|
|
|
Went over correction noted by prior inspections still have several areas that need to be addressed, I told builder that I can not keep coming out to job to tell him the same things,( SEE PRIOR INSPECTIONS ON THIS PERMIT) they need to have building ready for inspection, or Architect to walk project and submit that it is ready. 5/30/2003 5:54:55 PM
|
BLD-Framing/Rough-in | 5/22/2003 | 5/23/2003 | 5/23/2003 | A | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 5/22/2003 at 6:17:25 PM. Contact: ###-####. c/n's have been posted. 5/27/2003 9:50:42 AM
|
BLD-Framing/Rough-in | 5/21/2003 | 5/22/2003 | 5/22/2003 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 5/21/2003 at 4:37:01 PM. Contact: ###-####. still needs work as discused. 5/27/2003 9:51:48 AM
|
BLD-Conference | 5/20/2003 | 5/21/2003 | 5/21/2003 | A | FAIL |
Russ Owen
|
|
|
vincent; Phone #: ###-#### Internet Inspection Request from: Barbara MooreWent over general requiremants with contractor also present George and Carl. there are numerous areas which need penetration protection and drywall backing etc. 5/22/2003 12:52:21 PM
|
BLD-Conference | 5/20/2003 | 5/21/2003 | 5/21/2003 | A | PASS |
Carl Dependahl
|
|
|
Sent to Carl by me., 5/20/2003 5:05:15 PM 5/20/2003 5:05:51 PM...onsite w/ supt. & GS. 5/21/2003 11:19:36 AM
|
BLD-Conference | 5/19/2003 | 5/20/2003 | 5/20/2003 | P | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 5/19/2003 at 5:58:38 PM. Contact: ###-####.All corrections need to be complied with as the 1hr exterior wall detail for assembly. 5/20/2003 5:00:08 PM
|
BLD-Framing/Rough-in | 5/16/2003 | 5/19/2003 | 5/19/2003 | A | FAIL |
Russ Owen
|
|
|
I have a c/n posted note these have been insulated with out approval. 5/19/2003 5:11:45 PM
|
BLD-Framing/Rough-in | 5/15/2003 | 5/16/2003 | 5/16/2003 | A | CANC |
Jim Sly
|
|
|
robert; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Canc by contr. 5/16/2003 1:06:26 PM
|
BLD-Framing/Rough-in | 5/16/2003 | 5/16/2003 | 5/16/2003 | P | CANC |
Tom Arcoraci
|
|
|
###-####- ROBERT out of time 5/16/2003 4:44:17 PM
|
BLD-Framing/Rough-in | 5/1/2003 | 5/5/2003 | 5/5/2003 | A | PART |
Russ Owen
|
|
|
###-#### bob. Ok to side still need blocking at top of 2nd floor , as prior c/n indicates. 5/6/2003 9:28:16 AM
|
BLD-Framing/Rough-in | 4/25/2003 | 4/28/2003 | 4/28/2003 | P | FAIL |
Russ Owen
|
|
|
vincent; Phone #: ###-#### Internet Inspection Request from: Annette Moore. c/n posted. 4/29/2003 4:32:21 PM
|
BLD-Framing/Rough-in | 4/24/2003 | 4/25/2003 | 4/25/2003 | P | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 4/24/2003 at 3:04:15 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 4/15/2003 | 4/16/2003 | 4/16/2003 | A | FAIL |
Russ Owen
|
|
|
###-#### vincent . These plan are not clearly indicateing engineered features, I have again requested more clairification from engineer. Note:###-#### vincent . These plan are not clearly indicating engineered features, I have again requested more clairification from engineer. the engineer did not draw these details. 4/16/2003 4:48:35 PM
|
BLD-Conference | 4/3/2003 | 4/4/2003 | 4/4/2003 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 4/3/2003 at 9:59:28 AM. Contact: ###-####.Went over engineering. 4/4/2003 1:31:16 PM
|
BLD-Conference | 3/21/2003 | 3/24/2003 | 3/24/2003 | P | PART |
Russ Owen
|
|
|
###-####conf on stairs 3/25/2003 12:21:19 PM
|
BLD-Foundation | 2/12/2003 | 2/13/2003 | 2/13/2003 | A | PASS |
Russ Owen
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|
BLD-Footing | 2/6/2003 | 2/7/2003 | 2/7/2003 | A | PASS |
Russ Owen
|
|
|
morgan; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Wall cover | 8/15/2003 | 8/15/2003 | | P | |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 8/15/2003 at 9:54:18 AM. Contact: ###-####.
|