Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD02-01071
StatusFinaled
Name PENTALON CONSTRUCTION, INC.
Site Address 8561 W FAIRVIEW
Project NameASPEN SPRINGS APARTMENTS
Customer Number 
ePlanReviewNo
Description
Building 12 Type C Section 1) * A two hour area separation wall will be constructed to divide this building into two separate buildings. * To construct a new 12,270 sq.ft. two story with a basement, 12 unit apartment building. The basement is approximately 4,228 sq.ft. and the first and second floor are approximately 4,021 sq.ft each. All construction is per the approved plans and attached comment list. Work to include on site landscaping and parking lot. Refer to BLD 02-02717 for other side of area separation wall. MJP DRH02-00005 CUP01-00164 PC#284-02
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 1/20/20041/20/2004 DONE
Details
FIRE-Final Inspection12/22/200312/23/200312/23/2003APASS
DetailsTroy Cobbley
fire alarm and fire life safety finaled 12/23/2003 11:01:24 AM
FIRE-Final Inspection12/22/200312/22/200312/22/2003PCANC
DetailsTroy Cobbley
rescheduled for tomorrow 12/22/2003 3:10:52 PM
Code Occupancy Approval  12/22/2003 PAS
LANDSCAPE IN PLACE FINAL SIGNED OFF
BLD-Other10/10/200310/10/200310/10/2003APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/10/2003 at 7:21:19 AM. Contact: ###-####. Gypcrete at tubs 10/10/2003 12:15:29 PM
BLD-Energy code compliance10/6/200310/6/200310/6/2003PPASS
DetailsJim Sly
###-#### chris Frame Pass 10/6/2003 5:17:52 PM
BLD-Energy code compliance10/3/200310/3/200310/3/2003PNR
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/3/2003 at 7:22:50 AM. Contact: ###-####.
BLD-Framing/Rough-in10/1/200310/2/200310/2/2003AFAIL
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/1/2003 at 8:41:55 AM. Contact: ###-####. Firestop, draftstop, ..... 10/2/2003 10:22:34 AM
BLD-Framing/Rough-in10/1/200310/1/200310/1/2003PNR
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/1/2003 at 8:29:48 AM. Contact: ###-####.
BLD-Framing/Rough-in8/27/20038/27/20038/27/2003PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 8/27/2003 at 9:10:36 AM. Contact: ###-####. ok to side 8/27/2003 4:55:12 PM
BLD-Framing/Rough-in8/25/20038/26/20038/26/2003APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 8/25/2003 at 11:50:50 AM. Contact: ###-####. c/n shear 8/26/2003 1:54:03 PM
BLD-Framing/Rough-in7/31/20038/1/20038/1/2003APART
DetailsRuss Owen
BLD-Framing/Rough-in7/30/20037/31/20037/31/2003ACANC
DetailsRuss Owen
out of time 7/31/2003 6:55:16 PM
BLD-Foundation4/2/20034/2/20034/2/2003PPASS
DetailsRuss Owen
###-####
BLD-Footing3/26/20033/27/20033/27/2003ACANC
DetailsRuss Owen
VINCENT; Phone #: ###-#### Internet Inspection Request from: Marsha Smylieunable to do out of time i will reschedual for pm. 3/27/2003 1:09:26 PM
BLD-Foundation3/27/20033/27/20033/27/2003PPART
DetailsRuss Owen
BLD-Aging Inspection3/18/20033/18/20033/18/2003 CANC
DetailsRuss Owen
work is underway. 3/18/2003 12:27:20 PM