BLD-Conference | 5/13/2002 | 5/13/2002 | 5/13/2002 | P | PASS |
Jim Storey
|
|
|
justin ###-#### for conf--call 1st before insp placed with out insp appears to be adiquit in size and depth. 5/13/2002 3:13:58 PM
|
BLD-Final | 5/13/2002 | 5/13/2002 | 5/13/2002 | P | PASS |
Jim Storey
|
|
|
|
BLD-Footing | 5/9/2002 | 5/10/2002 | 5/10/2002 | A | FAIL |
Jim Storey
|
|
|
out of time 5/9poured with out insp unable to verrify depth or load location. pad ft not ft and wall per plan review. 5/10/2002 11:43:13 AM
|
BLD-Footing | 5/9/2002 | 5/9/2002 | 5/9/2002 | P | CANC |
Jim Storey
|
|
|
justin ###-#### ft out of time 5/9/2002 5:42:04 PM
|
BLD-Final | 5/3/2002 | 5/6/2002 | 5/6/2002 | A | FAIL |
Jim Storey
|
|
|
1. FOOTING FROST PROTECTION - Footings and foundations shall be constructed of masonry, concrete or treated wood and shall extend a minimum of 24 inches below finished grade for frost protection. Footings of concrete and masonry shall be of solid material. Foundations supporting wood shall extend at least 6 inches above the adjacent finish grade. 1994 UBC 1806.1 & Boise City Code 4-02-15 expose to verify depth and size.
|